By the end of othis course you will be able to: (a) Identify the scope of API RP 574
Identify piping components and pipe-joining methods; (b) Identify reasons for inspection and requirements of inspection plans; (c) Recognize the frequency and extent of inspection; (d) Recognize safety precautions, preparatory work, inspection procedures, and inspection practices; (e) Recognize requirements of pressure tests and determination of minimum required thickness, and; (f) Identify requirements for records