Standards Plan
Below is a list of standards in development by industry segment.
See a breakdown of standards in pre-ballot, ballot, and editing: Chart Standards
For the best experience, please view on full-size desktop
Committee | Pub. Type | Pub. No | Title | Ed. | Pre-Ballot Phase | Ballot Phase | In Editing |
---|---|---|---|---|---|---|---|
CRE | RP | 552 | Signal Processing, Transmission, and Installation | 2 | X | ||
CRE | Std | 579 | Fitness-For-Service | 2 | X | ||
CRE | Std | 650-A4 | Addendum 4 to Welded Steel Tanks for Oil Storage | 10 | X | ||
COSFP | TR | 2510A | Fire Protection Considerations for the Design and Operation of Liquefied Petroleum Gas (LPG) Storage Facilities | 3 | X | ||
COSFP | RP | 2210 | Flame Arresters for Vents of Tanks Storing Petroleum Products | 4 | X | ||
COSFP | RP | 2028 | Flame Arresters in Piping Systems | 4 | X | ||
CRE | Std | 672-E1 | Errata to Packaged, Integrally Geared Centrifugal Air Compressors for Petroleum, Chemical, and Gas Industry Services | 4 | X | ||
GCM | RP | 1639 | Owner/Operator's Guide to Operation and Maintenance of Vapor Recovery Systems at Gasoline Dispensing Facilities | 2 | X | ||
CRE | Std | 650-A3 | Addendum 3 to Welded Tanks for Oil Storage | 11 | X | ||
CRE | RP | 934-F | Minimum Pressurization Temperatures, MPT, for Heavy Wall Pressure Vessels | 1 | X | ||
CRE | RP | 934-I | Periodic Inspection of 2 1/4Cr-1Mo and 2 1/4Cr-1Mo-V Steel Pressure Vessels in High Pressure, High Temperature Hydrogen-Containing Service | 1 | X | ||
CRE | Std | 561 | Reforming Furnaces for Hydrogen and Syngas Production | 1 | X | ||
GCM | Std | 1631 | Interior Lining and Periodic Inspection of Underground Storage Tanks | 6 | X | ||
CRE | RP | 545 | Lightning Protection for Aboveground Storage Tanks | 2 | X | ||
CRE | Std | 810 | Welded Plate-Block Heat Exchangers | 1 | X | ||
CRE | RP | 686 | Machinery Installation and Installation Design | 3 | X | ||
CRE | Std | 682 | Pumps—Shaft Sealing Systems for Centrifugal and Rotary Pumps | 5 | X | ||
CRE | RP | 553 | Refinery Valves and Accessories for Control and Safety Instrumented Systems | 3 | X | ||
CRE | RP | 581 | Risk-Based Inspection Methodology | 4 | X | ||
CRE | Std | 660 | Shell-and-Tube Heat Exchangers | 10 | X | ||
CRE | Std | 661 | Petroleum, Petrochemical, and Natural Gas Industries—Air-Cooled Heat Exchangers for General Refinery Service | 8 | X | ||
CRE | Std | 530 | Calculation of Heater-tube Thickness in Petroleum Refineries | 8 | X | ||
CRE | Std | 673 | Centrifugal Fans for Petroleum, Chemical and Gas Industry Services | 4 | X | ||
CRE | RP | 555 | Process Analyzers | 4 | X | ||
CRE | RP | 556 | Instrumentation, Control, and Protective Systems for Gas Fired Heaters | 3 | X | ||
CRE | Std | 2000 | Venting Atmospheric and Low-pressure Storage Tanks | 8 | X | ||
COSFP | RP | 2201 | Safe Hot Tapping Practices in the Petroleum and Petrochemical Industries | 6 | X | ||
CRE | Std | 619 | Rotary-Type Positive Displacement Compressors for Petroleum, Petrochemical and Natural Gas Industries | 6 | X | ||
GCM | RP | 1595 | Design, Construction, Operation, Maintenance, and Inspection of Aviation Pre-Airfield Storage Terminals | 3 | X | ||
CRE | TR | 656 | Understanding and Planning for Natural Hazards Impacts on Petroleum and Chemical Storage Facilities | 1 | X | ||
CRE | TR | 558 | Standard Critical Definitions for Instrumentation and Controls | 1 | X | ||
CRE | Std | 625 | Tank Systems for Refrigerated Liquefied Gas Storage | 2 | X | ||
CRE | Std | 674 | Positive Displacement Pumps-Reciprocating | 4 | X | ||
CRE | RP | 586 | NDT Methods for Equipment Damage Mechanisms | 1 | X | ||
GCM | API | 1509-A1 | Engine Oil Licensing and Certification System (Addendum 1) | 20 | X | ||
CRE | Std | 670 | Machinery Protection Systems | 6 | X | ||
CRE | Std | 603 | Corrosion-Resistant, Bolted Bonnet Gate Valves--Flanged and Butt-Welding Ends | 10 | X | ||
CRE | RP | 551 | Process Measurement Instrumentation | 3 | X | ||
CRE | Std | 537 | Flare Details for Petroleum, Petrochemical, and Natural Gas Industries—Russian | 4 | X | ||
CRE | RP | 591 | Process Valve Qualification Procedure | 7 | X | ||
CRE | Std | 541 | Form-Wound Squirrel-Cage Induction Motors 500 Horsepower and Larger | 6 | X | ||
CRE | RP | 592 | Elements for the Establishment of a Fixed Equipment Mechanical Integrity Program | 1 | X | ||
CRE | TR | 983 | Refractory Insulating Castables with Permanent Linear Change Anomaly - Case Study | 1 | X | ||
CRE | Std | 521 | Guide for Pressure-relieving and Depressuring Systems | 8 | X | ||
CRE | RP | 934-A | Materials and Fabrication of 2 1/4Cr-1Mo, 2 1/4Cr-1Mo-1/4V, 3Cr-1Mo, and 3Cr-1Mo-1/4V Steel Heavy Wall Pressure Vessels for High-temperature, High-pressure Hydrogen Service | 4 | X | ||
CRE | Std | 610 | Centrifugal Pumps for Petroleum, Petrochemical and Natural Gas Industries | 13 | X | ||
CRE | Std | 599 | Metal Plug Valves — Flanged, Threaded and Welding Ends | 9 | X | ||
COSFP | RP | 2021 | Management of Atmospheric Storage Tank Fires | 5 | X | ||
CRE | Spec | 12B | Specification for Bolted Tanks for Storage of Production Liquids | 18 | X | ||
CRE | Std | 2610 | Design, Construction, Operation, Maintenance and Inspection of Terminal and Tank Facilities | 4 | X | ||
CRE | Std | 692 | Dry Gas Sealing Systems for Axial, Centrifugal, and Rotary Screw Compressors and Expanders | 2 | X | ||
CRE | RP | 583 | Corrosion Under Insulation and Fireproofing | 3 | X | ||
CRE | RP | 584 | Integrity Operating Windows | 3 | X | ||
CRE | RP | 588 | Recommended Practice for Source Inspection and Quality Surveillance of Fixed Equipment | 2 | X | ||
CRE | RP | 505 | Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as Class I, Zone 0, Zone 1 and Zone 2 | 3 | X | ||
CRE | Std | 602 | Gate, Globe, and Check Valves for Sizes DN 100 (NPS 4) and Smaller for the Petroleum and Natural Gas Industries | 12 | X | ||
CRE | Std | 599 | Metal Ball Valves--Flanged, Threaded and Butt-Welding Ends | 7 | X | ||
CRE | Std | 609 | Butterfly Valves: Double-flanged, Lug- and Wafer-type, and Butt-welding Ends | 10 | X | ||
CRE | Std | 520 Pt 1 | Sizing, Selection, and Installation of Pressure-Relieving Devices in Refineries--Part 1, Sizing and Selection | 11 | X | ||
CRE | Std | 520 Pt 2 | Sizing, Selection, and Installation of Pressure-relieving Devices. Part II - Installation | 8 | X | ||
CRE | Std | 589 | Fire Test for Evaluation of Valve Stem Packing | 3 | X | ||
CRE | Std | 622 | Type Testing of Process Valve Packing for Fugitive Emissions | 4 | X | ||
CRE | RP | 573 | Inspection of Fired Boilers and Heaters | 5 | X | ||
CRE | RP | 577 | Welding Processes, Inspection, and Metallurgy | 4 | X | ||
CRE | TR | 934-G | Design, Fabrication, Operational Effects, Inspection, Assessment and Repair of Coke Drums and Peripheral Components in Delayed Coking Units | 2 | X | ||
CRE | Std | 527 | Seat Tightness of Pressure Relief Valves | 6 | X | ||
CRE | RP | 626 | Refrigerated and Cryogenic Tank Inspection, Repair, and Alteration | 1 | X | ||
CRE | Spec | 701 | Electric Immersion Heaters | 1 | X | ||
CRE | Std | 668 | Brazed Aluminum Plate-fin Heat Exchangers for General Refinery Services (Formerly Std. 662, Part 2) | 2 | X | ||
CRE | API | 510 | Pressure Vessel Inspection Code: In-service Inspection, Rating, Repair, and Alteration | 12 | X | ||
CRE | RP | 574-A1 | Inspection Practices for Piping System Components | 5 | X | ||
CRE | RP | 580-A1 | Elements of a Risk-Based Inspection Program | 4 | X | ||
CRE | TR | 585 | Pressure Equipment Integrity Incident Investigation | 3 | X | ||
CRE | TR | 593 | Inspection Practices for Piping System Components | 1 | X | ||
CRE | Std | 600 | Steel Gate Valves - Flanged and Butt-welding Ends, Bolted Bonnets | 15 | X | ||
CRE | Std | 623 | Steel Globe Valves—Flanged and Butt-welding Ends, Bolted Bonnets | 3 | X | ||
CRE | Std | 526 | Flanged Steel Pressure-relief Valves | 9 | X | ||
CRE | RP | 500 | Classification of Locations for Electrical Installations at Petroleum Facilities Classified as Class I, Division 1 and Division 2 | 5 | X | ||
CRE | Std | 547 | General-purpose Form-wound Squirrel Cage Induction Motors-250 Horsepower and Larger | 3 | X | ||
CRE | RP | 557 | Guide to Advanced Control Systems | 3 | X | ||
CRE | RP | 559 | Industrial Internet of things - IIOT | 1 | X | ||
CRE | API | 998 | Technical Data Book-Petroleum Refining | 12 | X | ||
CRE | RP | 2350 | Overfill Prevention for Storage Tanks in Petroleum Facilities | 6 | X | ||
CRE | RP | 571 | Damage Mechanisms Affecting Fixed Equipment in the Refining Industry | 4 | X | ||
CRE | Std | 534-A1 | Heat Recovery Steam Generators for Combustion Turbine Exhaust Applications | 3 | X | ||
CRE | Std | 535-A1 | Burners for Fired Heaters in General Refinery Services | 4 | X | ||
CRE | RP | 582 | Welding Guidelines for the Chemical, Oil, and Gas Industries | 5 | X | ||
CRE | Std | 560 | Fired Heaters for General Refinery Service | 6 | X | ||
CRE | TR | 962 | HIC Testing | 1 | X | ||
CRE | TR | 655 | Vapor Corrosion Inhibitors for Storage Tanks | 2 | X | ||
CRE | TR | 942-C | Materials, Fabrication, and Repair Considerations for Steam Methane Reformer and Pyrolysis Furnaces | 1 | X | ||
CRE | TR | 963 | Materials, Operations, and Inspection Guidelines for Corrosion Control in Renewable Fuels Production in Refineries. | 1 | X | ||
CRE | Std | 975 | Refractory Installation Quality Control – Inspection and Testing of Refractory Brick Systems and Materials | 2 | X | ||
CRE | Std | 984 | Refractory Installation Quality Control - Anchor Installation Requirements | 1 | X | ||
COSFP | RP | 2218 | Fireproofing Practices in Petroleum and Petrochemical Processing Plants | 4 | X | ||
CRE | TR | 934-J | Inspection, Assessment and Repair of Coke Drums and Peripheral Components in Delayed Coking Units | 2 | X | ||
CRE | RP | 938-D | Use of Duplex Stainless Steels in the Oil Refining Industry | 1 | X | ||
CRE | TR | TDB-1 | Technical Data Book: Part 1 – General Data | 1 | X | ||
CRE | TR | TDB-2 | Technical Data Book: Part 2 – Characterization of Hydrocarbons | 1 | X | ||
CRE | TR | TDB-3 | Technical Data Book: Part 3 – Petroleum Fraction Distillation Interconversions | 1 | X | ||
CRE | TR | TDB-4 | Technical Data Book: Part 4 – Critical Properties | 1 | X | ||
CRE | TR | TDB-5 | Technical Data Book: Part 5 – Vapor Pressure | 1 | X | ||
CRE | TR | TDB-6 | Technical Data Book: Part 6 – Density | 1 | X | ||
CRE | TR | TDB-7 | Technical Data Book: Part 7 – Thermal Properties | 1 | X | ||
CRE | TR | TDB-8 | Technical Data Book: Part 8 – Vapor-Liquid Equilibrium k-Values | 1 | X | ||
CRE | TR | TDB-9 | Technical Data Book: Part 9 – Phase Equilibria in Systems s Containing Water | 1 | X | ||
CRE | TR | TDB-10 | Technical Data Book: Part 10 – Surface and Interfacial Tension | 1 | X | ||
CRE | TR | TDB-11 | Technical Data Book: Part 11 – Viscosity | 1 | X | ||
CRE | TR | TDB-12 | Technical Data Book: Part 12 – Thermal Conductivity | 1 | X | ||
CRE | TR | TDB-13 | Technical Data Book: Part 13 – Diffusivity | 1 | X | ||
CRE | TR | TDB-14 | Technical Data Book: Part 14 – Combustion | 1 | X | ||
CRE | TR | TDB-15 | Technical Data Book: Part 15 – Adsorption Equilibria | 1 | X | ||
CRE | RP | 934-E | Materials and Fabrication of 1 1/4Cr-1/2Mo Steel Pressure Vessels for Service above 825 F (440 C) | 3 | X | ||
CRE | RP | 934-C | Materials and Fabrication of 1-1/4CR-1/2Mo Steel Heavy Wall Pressure Vessels for High-pressure Hydrogen Service Operating at or Below 825 Deg. F (440 Deg. C) | 3 | X | ||
CRE | Std | 556-1 | Instrumentation, Control and Protective Functions for Gas Fired Heaters – Part 1 Instrumentation | 1 | X | ||
CRE | Std | 556-2 | Instrumentation, Control and Protective Functions for Gas Fired Heaters – Part 2 Controls | 1 | X | ||
CRE | Std | 556-3 | Instrumentation, Control and Protective Functions for Gas Fired Heaters – Part 3 Protective Functions | 1 | X | ||
CRE | Std | 556-4 | Instrumentation, Control and Protective Functions for Gas Fired Heaters – Part 4 Flue Gas Analyzers | 1 | X | ||
CRE | Std | 556-5 | Instrumentation, Control and Protective Functions for Gas Fired Heaters – Part 5 Main Burner Ignition Criteria | 1 | X | ||
CRE | Std | 556-6 | Instrumentation, Control and Protective Functions for Gas Fired Heaters – Part 6 Tube Skin Thermocouples | 1 | X | ||
CRE | Std | 556-7 | Instrumentation, Control and Protective Functions for Gas Fired Heaters – Part 7 Overlay for Oil Fired Heaters | 1 | X | ||
CRE | Std | 556-8 | Instrumentation, Control and Protective Functions for Gas Fired Heaters – Part 8 Overlay for Steam Methane Reforming Furnaces | 1 | X | ||
CRE | Std | 560 | Fired Heaters for General Refinery Service | 7 | X | ||
CRE | Std | 537 | Flare Details for Petroleum, Petrochemical, and Natural Gas Industries | 5 | X | ||
CRE | RP | 941 | Steels for Hydrogen Service at Elevated Temperatures and Pressures in Petroleum Refineries and Petrochemical Plants | 9 | X |
For the best experience, please view on full-size desktop
Committee | Pub. Type | Pub. No | Title | Ed. | Pre-Ballot Phase | Ballot Phase | In Editing |
---|---|---|---|---|---|---|---|
COPM | Ch. | 7 | Temperature Determination | 2 | X | ||
COPM | Ch. | 20.6 | Recommended Practice for Production Allocation Methodologies and Techniques | 1 | X | ||
COPM | Ch. | 20.1 | Production Measurement and Allocation Systems | 2 | X | ||
COPM | Ch. | 17.9-A1 | Vessel Experience Factor (VEF), Addendum 1 | 2 | X | ||
COPM | Ch. | 17.9-SP | Vessel Experience Factor (VEF) Addendum 1—Spanish | 2 | X | ||
COPM | Ch. | 4.2 | Displacement Provers | 4 | X | ||
COPM | Ch. | 12.4.2 | Calculation of Petroleum – Base Prover Quantity Calibration – Master Meter Method (supersedes Ch. 12.2.5) | 1 | X | ||
COPM | Ch. | 12.4.3 | Calculation of Petroleum – Prover Quantity Calibration – Gravimetric Method | 1 | X | ||
COPM | Ch. | 21.2 | Electronic Liquid Measurement | 2 | X | ||
COPM | Ch. | 8.1-SP | Manual Sampling of Petroleum and Petroleum Products—Spanish | 4 | X | ||
COPM | Ch. | 10.10 | Continuous on-line Measurement of Water In Petroleum (Crude Oil and Condensate) | 1 | X | ||
COPM | Ch. | 5.8 | Measurement of Liquid Hydrocarbons by Ultrasonic Flow Meters | 3 | X | ||
COPM | Ch. | 21.1 | Electronic Gas Measurement | 3 | X | ||
COPM | Ch. | 20.4 | Phase Behavior Applications in Upstream Measurement | 1 | X | ||
COPM | Ch. | 9.1 | Standard Test Method for Density, Relative Density (Specific Gravity), or API Gravity of Crude Petroleum and Liquid Petroleum Products by Hydrometer Method(ASTM D1298) | 4 | X | ||
COPM | Ch. | 2.3 | Calibration of Spheres and Spheroids (supersedes Std 2552) | 1 | X | ||
COPS | RP | 1176 | Assessment and Management of Cracking in Pipelines | 2 | X | ||
COPM | Ch. | 14.3.2 | Concentric, Square-Edged Orifice Meters, Part 2—Specification and Installation Requirements (ANSI/API MPMS 14.3.2-20XX) (AGA Report No. 3, Part 2) | 6 | X | ||
COPM | TR | 2583 | Measurement of Produced Water for Custody Transfer | 1 | X | ||
RP | 1108 | Strain-based Engineering Critical Assessment of Girth Welds | 1 | X | |||
COPM | Ch. | 22.XX | Testing Protocols—Flow Conditioners for Orifice Meters | 1 | X | ||
COPS | RP | 1186 | Pipeline Safety Metrics | 1 | X | ||
COPS | TR | 1189 | Internal Corrosion in Pipeline Facilities | 1 | X | ||
COPM | Ch. | 13.2 | Statistical Methods of Evaluating Meter Proving Data | 3 | X | ||
COPM | Ch. | 17.10.2 | Measurement of Cargoes on Board Marine Gas Carriers, Part 2—Liquefied Petroleum and Chemical Gases | 3 | X | ||
COPM | Ch. | 23.1 | Reconciliation of Liquid Pipeline Quantities | 2 | X | ||
COPM | Ch. | 10.9 | Standard Test Method for Water in Crude Oils by Coulometric Karl Fischer Titration(ASTM D4928) | 5 | X | ||
COPM | TR | XX | Hydrocarbon Liquid Shrinkage and Flash Gas Factor Determination | 1 | X | ||
COPM | Ch. | 17.12 | Procedure for Bulk Liquid Chemical Cargo Inspection by Cargo Inspectors | 3 | X | ||
COPM | TR | 25XX | Sampling, Analysis, and Fluid Properties Determination for Bubble Point Liquids | 1 | X | ||
COPM | Ch. | 3.2 | Standard Practice for Gauging Petroleum and Petroleum Products in Tank Cars | 2 | X | ||
COPM | Ch. | 5.1 | General Considerations for Measurement by Meters | 5 | X | ||
COPM | Ch. | 5.2 | Measurement of Liquid Hydrocarbons by Displacement Meters | 4 | X | ||
COPM | Ch. | 5.3 | Measurement of Liquid Hydrocarbons by Turbine Meters | 6 | X | ||
COPM | Ch. | 14.XX | Pressure Determination | 1 | X | ||
COPM | Ch. | 13.X | Methods of Evaluating Gas Metering System Uncertainty | 1 | X | ||
COPM | Ch. | 12.2 | Calculation of Petroleum Quantities Using Dynamic Measurement Methods and Volumetric Correction Factors | 3 | X | ||
COPM | Ch. | 2.8A | Calibration of Tanks on Ships and Oceangoing Barges | 2 | X | ||
COPM | Ch. | 6.XA | API MPMS Chapter 6.XA Metering Assemblies for Supercritical and Dense Phase Fluids | 1 | X | ||
COPS | RP | 1161 | Pipeline Operator Qualification | 6 | X | ||
COPS | RP | 1173 | Pipeline Safety Management Systems | 2 | X | ||
COPS | RP | 1169 | Pipeline Construction Inspection | 3 | X | ||
COPS | RP | 1102 | Steel Pipelines Crossing Railroads and Highways | 8 | X | ||
COPS | RP | 11CO2 | Transportation of Carbon Dioxide by Pipeline | 1 | X | ||
RPS | RP | 3000 | Classifying and Loading of Crude Oil into Rail Tank Cars | 2 | X | ||
COPM | Ch. | 12.1.2-E1 | Calculation of Static Petroleum Quantities, Part 2—Calculation Procedures for Tank Cars | 2 | X | ||
Std | 780 | Security Risk Assessment Methodology for the Petroleum and Petrochemical Industries | 2 | X | |||
COPM | Ch. | 2.2A | Measurement and Calibration of Upright Cylindrical Tanks by the Manual Strapping Method | 3 | X | ||
COPM | Ch. | 3.1B | Standard Practice for Level Measurement of Liquid Hydrocarbons in Stationary Tanks by Automatic Tank Gauging | 5 | X | ||
COPM | Ch. | 5.X | Measurement of Conductive Liquids by Electromagnetic Meters | 1 | X | ||
COPM | TR | 25XX | Double-Block-and-Bleed Verification in Measurement Applications | 1 | X | ||
COPM | Ch. | 6.XB | API MPMS Chapter 6.XB Metering Assemblies for the Measurement of Liquid, Dense or Supercritical Phase Carbon Dioxide | 1 | X | ||
COPS | RP | 11PCM | Pipeline Pressure Cycle Management | 1 | X | ||
COPS | RP | 1183 | Measuring and Assessing Dents in Pipelines | 2 | X | ||
COPM | Ch. | 17.5 | Guidelines for Cargo Analysis and Reconciliation | 5 | X | ||
COPM | Ch. | 17.10.1 | Measurement of Cargoes on Board Marine Gas Carriers, Part 1—Liquefied Natural Gas [ISO 10976:2023] | 3 | X | ||
COPM | Ch. | 14.4 | Converting Mass of Natural Gas Liquids or Vapors to Equivalent Liquid Volumes(GPA 8173-XX) | 3 | X | ||
COPM | Ch. | 22.4 | Testing Protocols—Pressure, Differential Pressure, and Temperature Measuring Devices | 2 | X | ||
COPM | Ch. | 14.3.1 | Concentric, Square-Edged Orifice Meters, Part 1—General Equations and Uncertainty Guidelines (includes Errata dated July 2013) (ANSI/API MPMS 14.3.1-202X) (AGA Report No. 3, Part 1) | 5 | X | ||
COPM | Ch. | 20.X | Full Range Online Water | 1 | X | ||
COPM | TR | 2581 | Wet Gas Sampling | 2 | X | ||
COPM | Ch. | 14.10 | Measurement of Flow to Flares | 3 | X |
For the best experience, please view on full-size desktop
Committee | Pub. Type | Pub. No | Title | Ed. | Pre-Ballot Phase | Ballot Phase | In Editing |
---|---|---|---|---|---|---|---|
CSOEM | RP | 2L-1 | Planning and Designing Helidecks | 5 | X | ||
CSOEM | RP | 2SM-A1 | Addendum 1 to Recommended Practice for Design, Manufacture, Installation, and Maintenance of Synthetic Fiber Ropes for Offshore Mooring | 1 | X | ||
CSOEM | RP | 5L7 | Recommended Practice for Unprimed Internal Fusion Bonded Epoxy Coating of Line Pipe | 3 | X | ||
CSOEM | RP | 5L2 | Internal Coating of Line Pipe for Non-Corrosive Gas Transmission Service | 5 | X | ||
CSOEM | RP | 5L8 | Field Inspection of New Line Pipe | 3 | X | ||
CSOEM | Spec | 5L-A3 | Specification for Line Pipe (includes Errata 1, dated January 2009 and Addendum 1, dated February 2009) | 44 | X | ||
CSOEM | RP | 11BR | Care and Handling of Sucker Rods | 10 | X | ||
CSOEM | RP | 17O-A1 | Recommended Practice for High Integrity Pressure Protection Systems (HIPPS) | 1 | X | ||
CSOEM | Spec | 6D-A3 | Addendum 3 to Specification for Pipeline Valves | 23 | X | ||
CSOEM | RP | 17G4 | Recommended Practice for Subsea Riserless Light Well Intervention Systems | 1 | X | ||
DPOSC | RP | 68 | Well Servicing and Workover Operations Involving Hydrogen Sulfide | 2 | X | ||
CSOEM | Spec | 16B | Coiled Tubing, Snubbing, and Wireline Well Intervention Equipment | 1 | X | ||
CSOEM | RP | 5L1 | Railroad Transportation of Line Pipe | 8 | X | ||
CSOEM | RP | 5LW | Transportation of Line Pipe on Barges and Marine Vessels | 4 | X | ||
CSOEM | Spec | 5LCP | Coiled Line Pipe | 3 | X | ||
CSOEM | RP | 7L | Inspection, Maintenance, Repair, and Remanufacture of Drilling Equipment | 2 | X | ||
CSOEM | Std | 20R | Qualification of Suppliers of Subsurface Electronics for Use in the Petroleum and Natural Gas Industries | 1 | X | ||
DPOSC | RP | 78 | Wellbore Surveying and Positioning | 1 | X | ||
CSOEM | RP | 1PSR | Preservation of Electrical, Mechanical, and Control Equipment during Procurement and Construction --PROJECT CANCELLED-- | 1 | X | ||
CSOEM | Spec | 8C | Drilling and Production Hoisting Equipment (PSL 1 and PSL 2) | 6 | X | ||
CSOEM | RP | 2GEN | General Requirements for Offshore Structures | 1 | X | ||
CSOEM | Spec | 16A | Drill-through Equipment | 5 | X | ||
CSOEM | Std | 16AS | Integration of Subsea BOP Equipment Systems for Drilling Wells | 1 | X | ||
CSOEM | RP | 16FR | Repair and Remanufacture of Marine Drilling Riser Equipment | 1 | X | ||
CSOEM | RP | 59 | Well Control Operations | 3 | X | ||
CSOEM | TR | 19G12 | Gas Lift Surveillance, Automation and Control Systems Canceled - information will be included in 19GLHB | 1 | X | ||
CSOEM | Spec | 16A-A2 | Specification for Drill-through Equipment | 4 | X | ||
CSOEM | RP | 2MET-A1 | Metocean Design and Operating Considerations | 1 | X | ||
CSOEM | Spec | 5B | Threading, Gauging, and Thread Inspection of Casing, Tubing, and Line Pipe Threads | 17 | X | ||
CSOEM | RP | 11AR | Recommended Practice for Care and Use of Subsurface Pumps | 5 | X | ||
CSOEM | Spec | 11E | Specification for Pumping Units(includes Errata dated August 2015) | 2 | X | ||
CSOEM | Spec | 11P | Packaged Reciprocating Compressors | 3 | X | ||
CSOEM | RP | 19G13 | Challenging Gas-lift Applications Canceled - information will be included in 19GLHB. | 1 | X | ||
CSOEM | RP | 19G14 | Gas-lift for Gas Well Deliquification Canceled - information will be included in 19GLHB. | 1 | X | ||
CSOEM | Spec | 19G15 | Conventional Flow Control Devices Canceled - information will be included 19G2. | 1 | X | ||
CSOEM | Spec | 11AX | Subsurface Sucker Rod Pump Assemblies, Components and Fittings | 14 | X | ||
CSOEM | RP | 16WL | Wireline Pressure Control Equipment Systems for Cased Hole | 1 | X | ||
CSOEM | RP | 16CBM | Condition Based Maintenance Systems | 1 | X | ||
CSOEM | RP | 16FI | Frac Iron Inspections | 1 | X | ||
CSOEM | RP | 16SP | BOP Shear Ram Performance Test Protocol (Formerly 16TR1) | 1 | X | ||
CSOEM | Spec | 17E | Specification for Subsea Umbilicals | 6 | X | ||
CSOEM | Std | 6ACRA | Age-Hardened Nickel-Based Alloys for Oil and Gas Drilling and Production Equipment | 2 | X | ||
CSOEM | Spec | 11B-A1 | Sucker Rods and Rod Related Products | 28 | X | ||
CSOEM | Spec | 7K | Drilling and Well Servicing Equipment | 7 | X | ||
CSOEM | Std | 16AR | Repair and Remanufacture of Drill-through Equipment | 2 | X | ||
CSOEM | Std | 17V | Recommended Practice for Analysis, Design, Installation, and Testing of Safety Systems for Subsea Applications | 2 | X | ||
CSOEM | Spec | 19AC | Completion Accessories | 2 | X | ||
CSOEM | Std | 2RD | Dynamic Risers for Floating Installations | 3 | X | ||
CSOEM | RP | 5B1 | Gauging and Inspection of Threads for Casing, Tubing, and Line Pipe | 6 | X | ||
CSOEM | RP | 16SB | Snubbing and Hydraulic Workover Well Control Equipment Systems | 1 | X | ||
CSOEM | RP | 16WS | Surface Well Servicing Pressure Control Equipment | 1 | X | ||
CSOEM | Std | 16CR | Repair and Remanufacture of Choke and Kill Equipment | 1 | X | ||
CSOEM | RP | 13D | Rheology and Hydraulics of Oil-well Drilling Fluids | 8 | X | ||
CSOEM | Spec | 15HR | High-pressure Fiberglass Line Pipe | 5 | X | ||
CSOEM | Spec | 15XX | Thermoplastic Liners for Oilfield Tubular Goods | 1 | X | ||
CSOEM | RP | 7G-2-A1 | Inspection and Classification of Used Drill Stem Elements | 2 | X | ||
CSOEM | Spec | 5DP -E1-A1 | Drill Pipe | 2 | X | ||
CSOEM | Spec | 5L-E1-A1 | Line Pipe | 46 | X | ||
CSOEM | TR | 5NCL | Nickel Content Limits for API 5CT Sour Service Products | 1 | X | ||
CSOEM | Spec | 5B-E1-E2-A1-A2-A3-A4 | Threading, Gauging, and Thread Inspection of Casing, Tubing, and Line Pipe Threads | 16 | X | ||
CSOEM | Spec | 5LC-E1-A1 | CRA Line Pipe | 4 | X | ||
CSOEM | Spec | 5LCP-E1-A1 | Specification on Coiled Line Pipe | 2 | X | ||
CSOEM | Std | 2CCU | Offshore Cargo Carrying Units | 2 | X | ||
CSOEM | Spec | 7-2-A1-E1-E2-A2-A3 | Threading and Gauging of Rotary Shouldered Connections (includes Errata 1, August 2017 and Errata 2, November 2019 and Addenda 1, March 2020) | 2 | X | ||
CSOEM | TR | 16CV | Charpy V-Notch Location for Weld Qualification | 1 | X | ||
CSOEM | RP | 19CL | Control Lines | 1 | X | ||
CSOEM | Spec | 20F | Corrosion Resistant Bolting for Use in the Petroleum and Natural Gas Industries | 3 | X | ||
CSOEM | TR | 6RG1 | BX Gaskets Sensitivity Study | 1 | X | ||
CSOEM | TR | 15TR2 | Alternative Qualification Tests for Spoolable Reinforced Plastic Line Pipe | 1 | X | ||
CSOEM | TR | 17FA | Flow Assurance Considerations in Subsea Production Systems | 1 | X | ||
CSOEM | Std | 65-2-A1 | Isolating Potential Flow Zones During Well Construction | 2 | X | ||
CSOEM | RP | 65-5 | Cement Sheath Evaluation | 1 | X | ||
CSOEM | TR | 10TR9 | Comparison of Atmospheric vs Pressurized Slurry Conditioning for Cements | 1 | X | ||
CSOEM | RP | 5MIF | Mechanical Interference Fit Connection | 1 | X | ||
CSOEM | RP | 5SF | Evaluating Connection Performance in Multi-Fractured Horizontal Wells | 1 | X | ||
CSOEM | TR | 10TR10 | HTHP Rheology Testing for Cement Slurries | 1 | X | ||
CSOEM | Std | 6Y | Fugitive Emissions Testing on Pipeline and Wellhead Equipment used in the Petroleum and Natural Gas Industries | 1 | X | ||
CSOEM | Spec | 17D-A2 | Specification for Subsea Wellhead and Tree Equipment | 3 | X | ||
CSOEM | RP | 17H | Remotely Operated Tools and Interfaces on Subsea Production Systems | 4 | X | ||
CSOEM | RP | 17P | Recommended Practice for Subsea Structures and Manifolds | 3 | X | ||
CSOEM | Spec | 17PV | Design and Operation of Subsea Production Systems— Specification for Valves on Subsea Structures | 1 | X | ||
CSOEM | TR | 10TR8 | Generation and Analysis of Foamed Cements | 1 | X | ||
CSOEM | RP | 21A | Materials Selection for Bolting | 1 | X | ||
CSOEM | Spec | Q2 | Quality Management System Requirements for Service Supply Organizations for the Petroleum and Natural Gas Industries | 3 | X | ||
CSOEM | Spec | 19LH | Liner Hanger Equipment | 2 | X | ||
CSOEM | Std | 20M | Qualification of Suppliers of Machining Services for Use in the Petroleum and Natural Gas Industries | 2 | X | ||
CSOEM | RP | 2CIM | Offshore Crane Integrity Management | 1 | X | ||
CSOEM | RP | 22A | Offshore Crane Lifting Accessories | 1 | X | ||
CSOEM | Spec | 16F | Marine Drilling Riser Equipment | 3 | X | ||
CSOEM | RP | 65-4 | Managed Pressure Cementing | 1 | X | ||
CSOEM | Std | 64 | Diverter Equipment Systems | 4 | X | ||
CSOEM | Std | 6Z | Valves in Hydrogen Service at Ambient Temperature | 1 | X | ||
CSOEM | RP | 17G3 | Recommended Practice for Subsea Well Intervention Systems Using Non-Ferrous Alloys | 2 | X | ||
CSOEM | TR | 17TR2 | The Aging of PA-11 Inflexible Pipes | 2 | X | ||
CSOEM | Spec | 19G2 | Flow-control Devices for Side-pocket Mandrels | 3 | X | ||
CSOEM | Spec | 19SS | Sand Screens | 2 | X | ||
CSOEM | RP | 14B | Design, Installation, Operation, Test and Redress of Subsurface Safety Valve Systems | 7 | X | ||
CSOEM | TR | 21C | Evaluating the Crack Initiation Toughness, Crack Resistance Curves, and Tensile Properties of Two Materials in High-Pressure Hydrogen Gas | 1 | X | ||
CSOEM | Std | 53 | Well Control Equipment Systems for Drilling Wells | 6 | X | ||
CSOEM | Std | 6DX | Actuators and Mounting Kits for Valves | 3 | X | ||
CSOEM | Std | 6AV1 | Validation of Safety and Shutdown Valves for Sandy Service | 4 | X | ||
CSOEM | Spec | 15LR | Low Pressure Fiberglass Line Pipe | 8 | X | ||
CSOEM | RP | 17O | Standard for Subsea High Integrity Pressure Protection Systems (HIPPS) | 3 | X | ||
CSOEM | Std | 17G | Design and Manufacture of Subsea Well Intervention Equipment | 4 | X | ||
CSOEM | Spec | 19OH | Openhole Isolation Equipment | 2 | X | ||
CSOEM | RP | 67 | Oilfield Explosives Safety | 4 | X | ||
CSOEM | RP | 11S2 | Electric Submersible Pump Testing | 3 | X | ||
DPOSC | RP | 79-2 | Tripping Operations with Surface Back-pressure Managed Pressure Drilling | 1 | X | ||
CSOEM | Bull | 16K | Inclusion of New Technology in Well Control Systems | 1 | X | ||
CSOEM | Bull | 2V | Design of Flat Plate Structures | 4 | X | ||
CSOEM | RP | 2JU | Site-specific Assessment for Mobile Offshore Units ― Jack-ups | 1 | X | ||
CSOEM | RP | 2GEO | Geotechnical and Foundation Design Considerations | 2 | X | ||
CSOEM | Spec | 6A | Specification for Wellhead and Tree Equipment | 22 | X | ||
CSOEM | RP | 2T | Planning, Designing and Constructing Tension Leg Platforms | 4 | X | ||
CSOEM | TR | 7DSC | Double-shoulder Connections | 1 | X | ||
DPOSC | Std | 79-3 | Tripping Operations with Surface Back-pressure Managed Pressure Drilling with Subsea Blowout Preventer | 1 | X | ||
DPOSC | RP | 14FZ | Design, Installation, and Maintenance of Electrical Systems for Fixed and Floating Offshore Petroleum Facilities for Unclassified and Class I, Zone 0, Zone 1, and Zone 2 Locations | 3 | X | ||
CSOEM | TR | 5C125 | NACE TM0177 Method D sour testing on Grade C125 - Procedural steps and acceptance criteria in 5CT | 1 | X | ||
CSOEM | RP | 5C3 | Calculating Performance Properties of Pipe Used as Casing or Tubing | 8 | X | ||
CSOEM | RP | 7G-A3 | Recommended Practice for Drill Stem Design and Operating Limits | 16 | X | ||
CSOEM | TR | 21TR2 | S-N Fatigue Design Guidelines and Test Data for Low Alloy Steel Bolts | 2 | X | ||
CSOEM | Spec | 16D | Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment | 4 | X | ||
CSOEM | Std | 16L | HPHT Well Control Equipment Design | 1 | X | ||
CSOEM | TR | 16M | Pressure Decline Rate for Equipment Pressure Test | 1 | X | ||
CSOEM | Std | 16N | Correlation Methods of Verification and Validation for Well Control Equipment Systems | 1 | X | ||
CSOEM | Std | 6FA | Standard for Fire Test of Valves | 6 | X | ||
CSOEM | Spec | 11PL | Plunger Lift Lubricators and Related Equipment | 2 | X | ||
CSOEM | RP | 17W | Recommended Practice for Subsea Capping Stacks | 3 | X | ||
CSOEM | Spec | 7-1-A1 | Rotary Drill Stem Elements | 2 | X | ||
CSOEM | Spec | 19G1 | Side-pocket Mandrels | 3 | X | ||
CSOEM | Std | 20S | Qualification of Metal Additive Manufacturing Processes and Components Production Control for Use in the Petroleum and Natural Gas Industries | 2 | X | ||
CSOEM | Spec | 20C | Closed Die Forgings for Use in the Petroleum and Natural Gas Industry | 4 | X | ||
CSOEM | Std | 20H | Heat Treatment Services - Batch Type for Equipment Used in the Petroleum and Natural Gas Industry | 3 | X | ||
CSOEM | Std | 20T | Additively Manufactured Polymer-Based Components for Use in the Petroleum and Natural Gas Industries | 2 | X | ||
CSOEM | Spec | 11E-A1 | Pumping Units | 20 | X | ||
CSOEM | RP | 11G | Installation, Maintenance and Lubrication of Pumping Units | 6 | X | ||
CSOEM | Spec | 9A-A2 | Specification for Wire Rope | 27 | X | ||
CSOEM | RP | 9B-A2 | Application, Care, and Use of Wire Rope for Oil Field Service | 14 | X | ||
CSOEM | Spec | 5CT-A1 | Casing and Tubing | 11 | X | ||
CSOEM | Spec | 5CRA | Corrosion-resistant Alloy Seamless Products for Use as Casing, Tubing, Coupling Stock, and Accessory Material | 3 | X | ||
CSOEM | Spec | 7V-A1 | Drill Stem Valves | 1 | X | ||
CSOEM | RP | 5C5 | Procedures for Testing Casing and Tubing Connections | 5 | X |
For the best experience, please view on full-size desktop
Committee | Pub. Type | Pub. No | Title | Ed. | Date Published |
---|---|---|---|---|---|
API | 001 | API Guidance Document for GHG Reporting | 1 | 03/31/2022 | |
Std | 1104 | Welding of Pipelines and Related Facilities | 22 | 07/27/2021 | |
COPM | Ch. | 10.1 | Standard Test Method for Sediment in Crude Oils and Fuel Oils by the Extraction Method(ANSI/ASTM D473) | 4 | 11/22/2022 |
COPM | Ch. | 10.2 | Standard Test Method of Water in Crude Oil by Distillation (ASTM D4006) | 5 | 12/13/2022 |
COPM | Ch. | 10.3 | Standard Test Method for Water and Sediment in Crude Oil by the Centrifuge Method (Laboratory Procedure)(ASTM D4007) | 5 | 12/13/2022 |
COPM | Ch. | 10.4 | Determination of Sediment and Water in Crude Oil by the Centrifuge Method (Field Procedure) | 5 | 08/26/2020 |
COPM | Ch. | 10.5 | Standard Test method for Water in Petroleum Products and Bituminous Materials by Distillation(ASTM D95) | 6 | 11/14/2024 |
COPM | Ch. | 10.6 | Standard Test Method for Water and Sediment in Fuel Oils by the Centrifuge Method (Laboratory Procedure)(ASTM D1796) | 6 | 12/13/2022 |
COPM | Ch. | 10.9 | Standard Test Method for Water in Crude Oils by Coulometric Karl Fischer Titration(ASTM D4928) | 4 | 11/20/2024 |
COPM | Ch. | 11.1-A2 | Addendum 2 to Temperature and Pressure Volume Correction Factors for Generalized Crude Oils, Refined Products, and Lubricating Oils | 1 | 05/16/2019 |
COPM | Ch. | 11.2.4 | Temperature Correction for the Volume of NGL and LPG Tables 23E, 24E, 53E, 59E, 60E | 2 | 06/03/2019 |
COPM | Ch. | 11.2.4-SP | Temperature Correction for the Volume of NGL and LPG Tables 23E, 24E, 53E, 59E, 60E | 2 | 09/18/2024 |
COPM | Ch. | 11.2.5 | A Simplified Vapor Pressure Correlation for Commercial NGLs(supersedes the Addendum to Chapter 11.2.2-1994) | 2 | 12/15/2020 |
COPM | Ch. | 11.3.3 | Miscellaneous Hydrocarbon Product Properties - Denatured Ethanol Density and Volume Correction Factors | 3 | 05/16/2019 |
COPM | Ch. | 11.3.3-SP | Miscellaneous Hydrocarbon Product Properties - Denatured Ethanol Density and Volume Correction Factors--Spanish | 3 | 11/10/2023 |
COPM | Ch. | 11.3.4 | Miscellaneous Hydrocarbon Properties - Denatured Ethanol and Gasoline Component Blend Densities and Volume Correction Factors | 1 | 05/16/2019 |
COPM | Ch. | 11.3.4-SP | Miscellaneous Hydrocarbon Properties - Denatured Ethanol and Gasoline Component Blend Densities and Volume Correction Factors-Spanish | 1 | 05/09/2024 |
COPM | Ch. | 11.4.1-SP | Properties of Reference Materials, Part 1 - Density of Water and Water Volume Correction factors for Calibration of Volumetric Provers | 2 | 10/31/2023 |
COPM | Ch. | 12.1.1 | Calculation of Static Petroleum Quantities, Part 1—Upright Cylindrical Tanks and Marine Vessels | 4 | 02/14/2019 |
COPM | Ch. | 12.2 | Calculation of Petroleum Quantities Using Dynamic Measurement Methods and Volumetric Correction Factors (Supersedes Chapters 12.2.1, 12.2.2, and 12.2.3) | 2 | 07/12/2021 |
COPM | Ch. | 12.4.1 | Calculation of Petroleum – Base Prover Quantity Calibration – Waterdraw Method (superseding Ch. 12.2.4) | 1 | 09/06/2023 |
COPM | Ch. | 13.2-SP | Statistical Methods of Evaluating Meter Proving Data | 2 | 08/02/2024 |
COPM | Ch. | 14.1 | Collecting and Handling of Natural Gas Samples for Custody Transfer | 8 | 09/06/2022 |
COPM | Ch. | 14.13 | Simplified Metering System Design and Performance-Based Methodology for Non-Custody Gas Measurement | 1 | 10/24/2022 |
COPM | Ch. | 14.14 | Venturi Metering of Natural Gas and Other Related Hydrocarbon Fluids | 1 | 03/21/2023 |
COPM | Ch. | 14.3.4 | Concentric, Square-Edged Orifice Meters, Part 4—Background, Development, Implementation Procedures and Subroutine Documentation (AGA Report No. 3, Part 4) | 4 | 10/16/2019 |
COPM | Ch. | 15 | Guidelines for the Use of Petroleum Industry-specific International System (SI) Units | 4 | 06/11/2019 |
COPM | Ch. | 17.1 | Guidelines for Marine Cargo Inspection | 7 | 02/17/2022 |
COPM | Ch. | 17.1-SP | Guidelines for Marine Cargo Inspection—Spanish | 7 | 07/18/2023 |
COPM | Ch. | 17.10.1 | Measurement of Cargoes on Board Marine Gas Carriers, Part 1—Liquefied Natural Gas [ISO 10976:2015] | 2 | 06/03/2021 |
COPM | Ch. | 17.11 | Measurement and Sampling of Liquid Hydrocarbon Cargoes Using Closed and Restricted Equipment | 3 | 01/16/2024 |
COPM | Ch. | 17.14.1 | Measurement of Bulk Cargoes by Draft Survey Part 1: Ocean Going Vessels | 1 | 10/30/2019 |
COPM | Ch. | 17.14.2 | Measurement of Bulk Cargoes by Draft Survey Part 2: Inland Barges | 1 | 10/30/2019 |
COPM | Ch. | 17.2 | Measurement of Cargoes on Board Tank Vessels | 3 | 01/09/2023 |
COPM | Ch. | 17.5 | Guidelines for Cargo Analysis and Reconciliation | 4 | 07/23/2019 |
COPM | Ch. | 17.6 | Guidelines for Determining the Fullness of Pipelines Between Marine Vessels and Shore Facilities | 3 | 09/29/2022 |
COPM | Ch. | 17.9 | Vessel Experience Factor (VEF) | 3 | 07/23/2019 |
COPM | Ch. | 18.2-SP | Custody Transfer of Crude Oil from Lease Tanks Using Alternate Measurement Methods | 1 | 11/29/2023 |
COPM | Ch. | 19.2 | Evaporative Loss from Floating-Roof Tanks(previously Publications 2517 and 2519) | 4 | 08/24/2020 |
COPM | Ch. | 19.3, Part H | Specification for Establishing Evaporative Loss Factors for Floating-roof Tank Devices | 2 | 04/14/2022 |
COPM | Ch. | 19.4 | Evaporative Loss Reference Information and Speciation Methodology | 4 | 10/05/2023 |
COPM | Ch. | 19.5 | Atmospheric Hydrocarbon Emissions from Marine Vessel Transfer Operations(formerly Publication 2514A) | 2 | 07/24/2023 |
COPM | Ch. | 19.6.2 | Evaporative Loss from the Cleaning of Storage Tanks | 1 | 09/03/2019 |
COPM | Ch. | 2.2A | Measurement and Calibration of Upright Cylindrical Tanks by the Manual Strapping Method | 2 | 11/25/2019 |
COPM | Ch. | 2.2B-A1 | Calibration of Upright Cylindrical Tanks Using the Optical Reference Line Method | 1 | 10/01/2019 |
COPM | Ch. | 2.4 | Measurement and Calibration of Tank Cars (formerly Std 2554) | 1 | 12/05/2024 |
COPM | Ch. | 2.7-A1 | Calibration of Barge Tanks | 1 | 09/14/2021 |
COPM | Ch. | 20.3 | Measurement of Multiphase Flow | 2 | 02/16/2024 |
COPM | Ch. | 22.1-A2 | Testing Protocols—General Guidelines for Developing Testing Protocols for Devices Used in the Measurement of Hydrocarbon Fluids | 2 | 02/24/2022 |
COPM | Ch. | 22.5 | Testing Protocols—Flow Computational Device | 1 | 03/27/2024 |
COPM | Ch. | 22.7 | Testing Protocol for Multi-Phase Meters | 1 | 01/19/2023 |
COPM | Ch. | 23.1-SP | Reconciliation of Liquid Pipelines--Spanish | 1 | 03/28/2024 |
COPM | Ch. | 23.2 | Reconciliation of Liquid Tank Car(s) Quantities | 1 | 08/20/2020 |
COPM | Ch. | 3.1B | Standard Practice for Level Measurement of Liquid Hydrocarbons in Stationary Tanks by Automatic Tank Gauging | 4 | 10/15/2021 |
COPM | Ch. | 3.1B-SP | Standard Practice for Level Measurement of Liquid Hydrocarbons in Stationary Tanks by Automatic Tank Gauging-Spanish | 4 | 10/05/2023 |
COPM | Ch. | 4.6 | Pulse Interpolation | 3 | 10/13/2021 |
COPM | Ch. | 4.8 | Operation of Proving Systems | 3 | 07/26/2021 |
COPM | Ch. | 4.9.1 | Methods of Calibration for Displacement and Volumetric Tank Provers, Part 1—Introduction to the Determination of the Volume of Displacement and Tank Provers | 2 | 04/13/2022 |
COPM | Ch. | 4.9.2-SP | Methods of Calibration for Displacement and Volumetric Tank Provers, Part 2—Determination of the Volume of Displacement and Tank Provers by the Waterdraw Method of Calibration-Spanish | 1 | 03/08/2023 |
COPM | Ch. | 5.6 | Measurement of Liquid Hydrocarbons by Coriolis Meters(ANSI/API MPMS 5.6-2002) | 2 | 12/21/2021 |
COPM | Ch. | 6.1-A1 | Lease Automatic Custody Transfer (LACT) Systems-Addendum 1 | 2 | 08/26/2020 |
COPM | Ch. | 6.1A | Metering Assemblies – General Considerations | 1 | 07/23/2021 |
COPM | Ch. | 6.2A | Metering Assemblies - Truck and Rail Loading and Unloading Measurement Systems | 1 | 07/23/2021 |
COPM | Ch. | 6.3A | Metering Assemblies - Pipeline and Marine Loading/Unloading Measurement Systems | 1 | 07/23/2021 |
COPM | Ch. | 6.4A | Lease Automatic Custody Transfer (LACT) Systems (supersedes Ch. 6.1) | 1 | 12/19/2023 |
COPM | Ch. | 7.1 | Temperature Determination, Part 1—Liquid in Glass Thermometers | 3 | 10/22/2024 |
COPM | Ch. | 7.5-SP | Temperature Determination—Automatic Tank Temperature Measurement Onboard Marine Vessels Carrying Refrigerated Hydrocarbon and Chemical Gas Fluids ISO 8310:2012(ANSI/API MPMS Chapter 7.5)--Spanish | 1 | 04/25/2024 |
COPM | Ch. | 8.1 | Manual Sampling of Petroleum and Petroleum Products (ASTM D4057) | 5 | 10/07/2019 |
COPM | Ch. | 8.1 | Manual Sampling of Petroleum and Petroleum Products (ASTM D4057) | 6 | 09/01/2022 |
COPM | Ch. | 8.1-SP | Manual Sampling of Petroleum and Petroleum Products (ASTM D4057) | 6 | 09/13/2024 |
COPM | Ch. | 8.2 | Standard Practice for Automatic Sampling of Petroleum and Petroleum Products(ASTM D4177) | 5 | 11/18/2020 |
COPM | Ch. | 8.2 | Standard Practice for Automatic Sampling of Petroleum and Petroleum Products(ASTM D4177) | 6 | 09/01/2022 |
COPM | Ch. | 8.2-SP | Standard Practice for Automatic Sampling of Petroleum and Petroleum Products(ASTM D4177) | 6 | 11/07/2024 |
COPM | Ch. | 8.3 | Standard Practice for Mixing and Handling of Liquid Samples of Petroleum and Petroleum Products | 2 | 09/16/2019 |
COPM | Ch. | 8.4 | Standard Practice for Sampling and Handling of Fuels for Volatility Measurement (ASTM D5842) | 5 | 05/19/2020 |
COPM | Ch. | 8.4 | Standard Practice for Sampling and Handling of Fuels for Volatility Measurement (ASTM D5842) | 6 | 01/29/2024 |
COPM | Ch. | 8.5 | Standard Practice for Manual Piston Cylinder Sampling of Volatile Crude Oils, Condensates and Liquid Petroleum Products | 2 | 09/01/2022 |
COPM | Ch. | 8.6 | Standard Practice for Continuous and Intermittent Sampling and Handling of Liquefied Natural Gas (Modified National Adoption of ISO 8943:2007) | 1 | 05/29/2020 |
COPM | Ch. | 8.6-SP | Standard Practice for Continuous and Intermittent Sampling and Handling of Liquefied Natural Gas (Modified National Adoption of ISO 8943:2007)- Spanish | 1 | 03/17/2023 |
COPM | Ch. | 9.2 | Standard Test Method for Density or Relative Density of Light Hydrocarbons by Pressure Hydrometer(ASTM D1657) | 4 | 01/12/2023 |
COPM | Ch. | 9.3 | Standard Test Method for Density, Relative Density, and API Gravity of Crude Petroleum and Liquid Petroleum Products by Thermohydrometer Method (ASTM D6822) | 4 | 01/29/2024 |
COPM | Ch. | 9.3 | Standard Test Method for Density, Relative Density, and API Gravity of Crude Petroleum and Liquid Petroleum Products by Thermohydrometer Method (ASTM D6822) | 5 | 11/13/2024 |
COPM | Ch. | 9.4-SP | Continuous Density Measurement Under Dynamic (Flowing) Conditions | 1 | 08/02/2024 |
COPM | TR | 2503 | Properties of Metals and Alloys for Use in Measurement Equipment | 1 | 04/18/2024 |
COPM | TR | 2579 | Liquid Hydrocarbon Measurement Uncertainty Calculations | 1 | 09/11/2020 |
COPM | TR | 2580 | Documentation Report and Data Files for: API MPMS Chapter 11.3.3 and API MPMS Chapter 11.3.4 | 1 | 05/16/2019 |
COPM | TR | 2581 | Wet Gas Sampling | 1 | 05/09/2024 |
COPM | TR | 2582 | Vapor Pressure of Heavy Petroleum Liquids For Estimating Emissions | 1 | 11/22/2024 |
COPS | Bull | 1178 | Integrity Data Management and Integration | 2 | 11/21/2024 |
COPS | RP | 1110 | Pressure Testing of Steel Pipelines for the Transportation of Gas, Petroleum Gas, Hazardous Liquids, Highly Volatile Liquids or Carbon Dioxide | 7 | 12/15/2022 |
COPS | RP | 1130 | Computational Pipeline Monitoring for Liquids | 2 | 04/28/2022 |
COPS | RP | 1160 | Managing System Integrity for Hazardous Liquid Pipelines | 3 | 02/27/2019 |
COPS | RP | 1161 | Pipeline Operator Qualification | 5 | 11/17/2021 |
COPS | RP | 1162 | Public Awareness Programs for Pipeline Operators | 3 | 08/11/2022 |
COPS | RP | 1165 | Pipeline SCADA Displays | 2 | 12/21/2022 |
COPS | RP | 1169 | Pipeline Construction Inspection | 2 | 03/03/2020 |
COPS | RP | 1170 | Design and Operation of Solution-mined Salt Caverns Used for Natural Gas Storage | 2 | 11/29/2022 |
COPS | RP | 1171 | Functional Integrity of Natural Gas Storage in Depleted Hydrocarbon Reservoirs and Aquifer Reservoirs | 2 | 11/29/2022 |
COPS | RP | 1175 | Pipeline Leak Detection - Program Management | 2 | 04/28/2022 |
COPS | RP | 1181 | Pipeline Operational Status Determination | 1 | 10/08/2019 |
COPS | RP | 1182 | Construction, Operation, and Maintenance of Large Diameter Rural Gas Gathering Lines | 1 | 03/26/2020 |
COPS | RP | 1183 | Measuring and Assessing Dents in Pipelines | 1 | 11/02/2020 |
COPS | RP | 1183-A1 | Measuring and Assessing Dents in Pipelines | 1 | 05/22/2024 |
COPS | RP | 1184 | Pipeline Facilities Construction Inspection | 1 | 10/21/2021 |
COPS | RP | 1185 | Pipeline Public Engagement | 1 | 03/28/2024 |
COPS | RP | 1187 | Pipeline Integrity Management of Landslide Hazards | 1 | 08/27/2024 |
COPS | RP | 1188 | Hazardous Liquid Pipeline Facilities Integrity Management | 1 | 01/11/2022 |
COPS | RP | 1188-A1 | Hazardous Liquid Pipeline Facilities Integrity Management | 1 | 12/20/2023 |
COPS | RP | 80 | Definition of Onshore Gas Gathering Lines | 2 | 03/26/2020 |
COPS | RP | 80-A1 | Addendum 1 to Definition of Onshore Gas Gathering Lines | 2 | 01/12/2023 |
COPS | Std | 1163 | In-line Inspection Systems Qualification | 3 | 09/29/2021 |
COPS | Std | 1164 | Pipeline Control Systems Cybersecurity | 3 | 08/18/2021 |
COPS | TR | 1179 | Hydrostatic Testing as an Integrity Management Tool | 1 | 05/22/2019 |
COPS | TR | 1190 | Crack ILI Response: Maximum Depth and Failure Pressure Ratio | 1 | 02/20/2024 |
COSFP | API | NA | Firefighting Foam Transition Guidance | 1 | 10/21/2020 |
COSFP | Publ | 0000 | Swift Water Spill Response Guide | 1 | 04/21/2021 |
COSFP | RP | 2001 | Fire Protection in Refineries | 10 | 07/15/2019 |
COSFP | RP | 2001-A1 | Fire Protection in Refineries | 10 | 10/24/2024 |
COSFP | RP | 2009 | Safe Welding, Cutting, and Hot Work Practices in the Petroleum and Petrochemical Industries | 8 | 03/29/2022 |
COSFP | TR | 1152 | Industry Recommended Subsea Dispersant Monitoring Plan | 2 | 11/02/2020 |
CRE | API | 510 | Pressure Vessel Inspection Code: In-service Inspection, Rating, Repair, and Alteration | 11 | 10/18/2022 |
CRE | API | 570 | Piping Inspection Code: In service Inspection, Rating, Repair, and Alteration of Piping Systems | 5 | 02/29/2024 |
CRE | API | 570-A3 | Addendum 3, Piping Inspection Code: In-service Inspection, Rating, Repair, and Alteration of Piping Systems | 4 | 06/16/2023 |
CRE | API | 579-2 | Fitness-For-Service Example Problems Manual | 2 | 05/15/2024 |
CRE | Bull | 590 | SCIMI Term, Definition, and Acronym Standardization Work Process | 1 | 11/01/2022 |
CRE | RP | 2026 | Safe Access/Egress Involving Floating Roofs of Storage Tanks in Petroleum Service | 4 | 07/22/2022 |
CRE | RP | 2027 | Ignition Hazards and Safe Work Practices for Abrasive Blasting of Atmospheric Storage Tanks in Hydrocarbon Service | 5 | 09/20/2024 |
CRE | RP | 2207 | Preparing Tank Bottoms for Hot Work | 8 | 04/28/2022 |
CRE | RP | 2350 | Overfill Prevention for Storage Tanks in Petroleum Facilities | 5 | 09/17/2020 |
CRE | RP | 500 | Classification of Locations for Electrical Installations at Petroleum Facilities Classified as Class I, Division 1 and Division 2 | 4 | 06/08/2023 |
CRE | RP | 554 Part 1 | Process Control Systems, Part 1: Process Control Systems Functions and Functional Specification Development | 3 | 04/13/2021 |
CRE | RP | 554-Part 2 | Process Control Systems-Process Control System Design | 2 | 08/30/2023 |
CRE | RP | 554-Part 3 | Process Control Systems-Project Execution and Process Control System Ownership | 2 | 01/27/2021 |
CRE | RP | 571 | Damage Mechanisms Affecting Fixed Equipment in the Refining Industry | 3 | 03/31/2020 |
CRE | RP | 572 | Inspection Practices for Pressure Vessels | 5 | 11/09/2023 |
CRE | RP | 573 | Inspection of Fired Boilers and Heaters | 4 | 01/15/2021 |
CRE | RP | 574 | Inspection Practices for Piping System Components | 5 | 02/29/2024 |
CRE | RP | 575 | Inspection of Atmospheric and Low Pressure Storage Tanks | 4 | 07/08/2020 |
CRE | RP | 575 | Inspection Practices for Atmospheric and Low-Pressure Storage Tanks | 5 | 09/19/2024 |
CRE | RP | 576 | Inspection of Pressure-relieving Devices | 5 | 09/27/2024 |
CRE | RP | 577 | Welding Processes, Inspection, and Metallurgy | 3 | 10/02/2020 |
CRE | RP | 578 | Guidelines for a Material Verification Program (MVP) for New and Existing Assets | 4 | 02/16/2023 |
CRE | RP | 579-1 | Fitness-For-Service | 4 | 01/31/2022 |
CRE | RP | 580 | Elements of a Risk-Based Inspection Program | 4 | 08/31/2023 |
CRE | RP | 581-A1 | Risk-Based Inspection Methodology | 3 | 04/05/2019 |
CRE | RP | 581-A2 | Risk-Based Inspection Methodology | 3 | 10/07/2020 |
CRE | RP | 582 | Welding Guidelines for the Chemical, Oil, and Gas Industries | 4 | 05/04/2023 |
CRE | RP | 583 | Corrosion Under Insulation and Fireproofing | 2 | 03/09/2021 |
CRE | RP | 584 | Integrity Operating Windows | 2 | 12/02/2021 |
CRE | RP | 585 | Pressure Equipment Integrity Incident Investigation | 2 | 04/21/2021 |
CRE | RP | 587 | Guidance for the Development of Ultrasonic Examiner Qualification Programs | 1 | 05/07/2021 |
CRE | RP | 588 | Recommended Practice for Source Inspection and Quality Surveillance of Fixed Equipment | 1 | 07/30/2019 |
CRE | RP | 591 | Process Valve Qualification Procedure | 6 | 04/17/2019 |
CRE | RP | 615 | Valve Selection Guide | 3 | 08/16/2022 |
CRE | RP | 621 | Reconditioning of Metallic Gate, Globe, and Check Valves | 5 | 10/18/2022 |
CRE | RP | 651 | Cathodic Protection of Aboveground Storage Tanks | 5 | 08/23/2024 |
CRE | RP | 652 | Linings of Aboveground Petroleum Storage Tank Bottoms | 5 | 05/15/2020 |
CRE | RP | 687 | Special-purpose Rotating Equipment Repairs | 2 | 10/17/2023 |
CRE | RP | 697 | Pump Repair | 1 | 04/20/2023 |
CRE | RP | 932-B | Design, Materials, Fabrication, Operation, and Inspection Guidelines for Corrosion Control in Hydroprocessing Reactor Effluent Air Cooler (REAC) Systems | 3 | 06/12/2019 |
CRE | RP | 934-A | Materials and Fabrication of 2 1/4Cr-1Mo, 2 1/4Cr-1Mo-1/4V, 3Cr-1Mo, and 3Cr-1Mo-1/4V Steel Heavy Wall Pressure Vessels for High-temperature, High-pressure Hydrogen Service | 3 | 01/24/2019 |
CRE | RP | 934-C | Materials and Fabrication of 1-1/4CR-1/2Mo Steel Heavy Wall Pressure Vessels for High-pressure Hydrogen Service Operating at or Below 825 Deg. F (440 Deg. C) | 2 | 02/22/2019 |
CRE | RP | 939-C | Guidelines for Avoiding Sulfidation (Sulfidic) Corrosion Failures in Oil Refineries | 2 | 01/10/2019 |
CRE | RP | 941-A1 | Steels for Hydrogen Service at Elevated Temperatures and Pressures in Petroleum Refineries and Petrochemical Plants | 8 | 08/06/2020 |
CRE | RP | 945 | Avoiding Environmental Cracking in Amine Units | 4 | 09/26/2022 |
CRE | RP | 970 | Corrosion Control Document Systems | 2 | 04/19/2023 |
CRE | Spec | 12B | Specification for Bolted Tanks for Storage of Production Liquids | 17 | 12/16/2020 |
CRE | Spec | 12F | Specification for Shop Welded Tanks for Storage of Production Liquids | 13 | 01/11/2019 |
CRE | Spec | 12F | Specification for Shop Welded Tanks for Storage of Production Liquids | 14 | 10/31/2024 |
CRE | Spec | 12P | Specification for Fiberglass Reinforced Plastic Tanks | 5 | 05/03/2022 |
CRE | Std | 12R1 | Installation, Operation, Maintenance, Inspection, and Repair of Tanks in Production Service | 6 | 03/11/2020 |
CRE | Std | 12R1-A1 | Installation, Operation, Maintenance, Inspection, and Repair of Tanks in Production Service | 6 | 06/21/2021 |
CRE | Std | 2015 | Requirements for Safe Entry and Cleaning of Petroleum Storage Tanks | 9 | 08/07/2024 |
CRE | Std | 2510 | Design and Construction of LPG Installations | 9 | 08/07/2020 |
CRE | Std | 520 Pt 1 | Sizing, Selection, and Installation of Pressure-Relieving Devices in Refineries--Part 1, Sizing and Selection | 10 | 10/28/2020 |
CRE | Std | 520 Pt 2 | Sizing, Selection, and Installation of Pressure-relieving Devices. Part II - Installation | 7 | 10/28/2020 |
CRE | Std | 521 | Guide for Pressure-relieving and Depressuring Systems | 7 | 06/02/2020 |
CRE | Std | 526 | Flanged Steel Pressure-relief Valves | 8 | 08/14/2023 |
CRE | Std | 527 | Seat Tightness of Pressure Relief Valves | 5 | 07/31/2020 |
CRE | Std | 530-A1 | Calculation of Heater-tube Thickness in Petroleum Refineries | 7 | 07/01/2019 |
CRE | Std | 530-A1-A2 | Calculation of Heater-tube Thickness in Petroleum Refineries | 7 | 12/23/2021 |
CRE | Std | 534 | Heat Recovery Steam Generators for Combustion Turbine Exhaust Applications | 3 | 05/01/2024 |
CRE | Std | 535 | Burners for Fired Heaters in General Refinery Services | 4 | 07/17/2024 |
CRE | Std | 537 | Flare Details for Petroleum, Petrochemical, and Natural Gas Industries | 4 | 11/15/2024 |
CRE | Std | 537-A1 | Flare Details for Petroleum, Petrochemical, and Natural Gas Industries | 3 | 06/02/2020 |
CRE | Std | 546 | Brushless Synchronous Machines-500 kVA and Larger | 4 | 05/12/2022 |
CRE | Std | 560-A1 | Addendum 1 to Fired Heaters for General Refinery Services | 5 | 05/13/2021 |
CRE | Std | 560-A2 | Fired Heaters for General Refinery Service | 5 | 12/20/2023 |
CRE | Std | 565 | Thermal Reactors for Sulfur Recovery Units in General Refinery Services | 1 | 06/28/2022 |
CRE | Std | 594 | Check Valves: Flanged, Lug, Wafer and Butt-welding | 9 | 02/10/2022 |
CRE | Std | 598 | Valve Inspection and Testing | 11 | 02/08/2023 |
CRE | Std | 599 | Metal Plug Valves — Flanged, Threaded and Welding Ends | 8 | 03/12/2020 |
CRE | Std | 600 | Steel Gate Valves - Flanged and Butt-welding Ends, Bolted Bonnets | 14 | 05/03/2021 |
CRE | Std | 602 | Gate, Globe, and Check Valves for Sizes DN 100 (NPS 4) and Smaller for the Petroleum and Natural Gas Industries | 11 | 05/17/2022 |
CRE | Std | 607 | Fire Test for Quarter-turn Valves and Valves Equipped with Nonmetallic Seats | 8 | 10/20/2022 |
CRE | Std | 608 | Metal Ball Valves--Flanged, Threaded and Butt-Welding Ends | 6 | 01/22/2020 |
CRE | Std | 609 | Butterfly Valves: Double-flanged, Lug- and Wafer-type, and Butt-welding Ends | 9 | 04/22/2021 |
CRE | Std | 610 | Centrifugal Pumps for Petroleum, Petrochemical and Natural Gas Industries | 12 | 01/26/2021 |
CRE | Std | 611 | General Purpose Steam Turbines for Petroleum, Chemical, and Gas Industry Services | 6 | 06/01/2022 |
CRE | Std | 612 | Petroleum, petrochemical and natural gas industries—Steam turbines—Special-purpose applications | 8 | 11/01/2020 |
CRE | Std | 613 | Special Purpose Gear Units for Petroleum, Chemical and Gas Industry Services | 6 | 07/14/2021 |
CRE | Std | 614 | Lubrication, Shaft-Sealing, and Control-Oil Systems and Auxiliaries for Petroleum, Chemical and Gas Industry Services | 6 | 02/20/2022 |
CRE | Std | 616 | Gas Turbines for the Petroleum, Chemical and Gas Industry Services | 6 | 09/15/2022 |
CRE | Std | 617 | Axial and Centrifugal Compressors and Expander-compressors | 9 | 04/01/2022 |
CRE | Std | 618 | Reciprocating Compressors for Petroleum, Chemical and Gas Industry Services | 6 | 05/15/2024 |
CRE | Std | 620-A3 | Addendum 3 to Design and Construction of Large, Welded, Low-Pressure Storage Tanks | 12 | 09/15/2021 |
CRE | Std | 622-A1 | Type Testing of Process Valve Packing for Fugitive Emissions | 3 | 03/23/2022 |
CRE | Std | 623 | Steel Globe Valves—Flanged and Butt-welding Ends, Bolted Bonnets | 2 | 01/27/2021 |
CRE | Std | 624 | Type Testing of Rising Stem Valves Equipped with Flexible Graphite Packing for Fugitive Emissions | 2 | 02/28/2023 |
CRE | Std | 625-A4 | Addendum 4 to Tank Systems for Refrigerated Liquefied Gas Storage | 1 | 09/15/2021 |
CRE | Std | 641 | Type Testing of Quarter-turn Valves for Fugitive Emissions | 2 | 10/12/2023 |
CRE | Std | 650 | Welded Tanks for Oil Storage | 13 | 03/18/2020 |
CRE | Std | 653-A1-Port | Tank Inspection, Repair, Alteration, and Reconstruction-Portuguese | 5 | 06/15/2020 |
CRE | Std | 653-A2 | Addendum 2 to Tank Inspection, Repair, Alteration, and Reconstruction | 5 | 05/12/2020 |
CRE | Std | 653-A3 | Tank Inspection, Repair, Alteration, and Reconstruction | 5 | 11/08/2023 |
CRE | Std | 660-A1 | Shell-and-Tube Heat Exchangers | 9 | 08/06/2020 |
CRE | Std | 663 | Hairpin Type Heat Exchangers | 2 | 08/22/2022 |
CRE | Std | 667 | Plate and Frame Heat Exchangers for General Refinery Services (Formerly Std. 662, Part 1) | 1 | 03/14/2022 |
CRE | Std | 669 | Heat Recovery Systems | 1 | 06/28/2022 |
CRE | Std | 671 | Special Purpose Couplings for Petroleum, Chemical and Gas Industry Services | 5 | 08/20/2020 |
CRE | Std | 672 | Packaged, Integrally Geared Centrifugal Air Compressors for Petroleum, Chemical, and Gas Industry Services | 5 | 08/19/2019 |
CRE | Std | 676 | Positive Displacement Pumps - Rotary | 4 | 02/02/2022 |
CRE | Std | 677 | General Purpose Gears, Slow Speed (Extruder) gears, and Epicyclic gear units for Petroleum, Chemical, and Gas Industry Services | 4 | 09/13/2021 |
CRE | Std | 681 | Liquid Ring Compressors and Vacuum Pumps in Petroleum, Chemical, and Gas Industry Services | 2 | 07/14/2021 |
CRE | Std | 685 | Sealless Centrifugal Pumps for Petroleum, Petrochemical, and Gas Industry Services | 3 | 07/26/2022 |
CRE | Std | 688 | Pulsation and Vibration Control in Positive Displacement Machinery Systems for Petroleum, Petrochemical, and Natural Gas Industry Services | 2 | 10/04/2023 |
CRE | Std | 936 | Refractory Installation Quality Control - Inspection and Testing Monolithic Refractory Linings and Materials | 5 | 03/06/2024 |
CRE | Std | 975 | Refractory Installation Quality Control – Inspection and Testing of Refractory Brick Systems and Materials | 1 | 11/10/2021 |
CRE | Std | 976 | Refractory Installation Quality Control – Inspection and Testing of AES/RCF Linings and Materials | 2 | 10/22/2024 |
CRE | Std | 981 | Petroleum, petrochemical and natural gas industries—Steam turbines—Special-purpose applications | 8 | 11/03/2020 |
CRE | Std | 982 | Inspection and Assessment of Refractory Linings | 1 | 10/26/2023 |
CRE | TR | 522 | Pressure Relief Systems Calculations | 1 | 04/20/2022 |
CRE | TR | 654 | Aboveground Storage Tank Caulking or Sealing the Bottom Edge Projection to the Foundation | 1 | 05/01/2019 |
CRE | TR | 655 | Vapor Corrosion Inhibitors for Storage Tanks | 1 | 04/28/2021 |
CRE | TR | 684-1 | Tutorial on the API Standard Paragraphs Covering Rotor Dynamics and Balance (An Introduction to Lateral Critical and Train Torsional Analysis and Rotor Balancing) | 1 | 11/14/2019 |
CRE | TR | 932-C | Use of Duplex Stainless Steels in Hydroprocessing Reactor Effluent Air Coolers (REACs) | 1 | 08/10/2022 |
CRE | TR | 934-B | Fabrication Considerations for Vanadium-Modified Cr-Mo Steel Heavy Wall Pressure Vessels | 2 | 01/05/2022 |
CRE | TR | 934-H | Inspection, Assessment, and Repair of Heavy Wall Reactor Vessels in High Temperature, High Pressure Hydrogen Service | 1 | 05/26/2022 |
CRE | TR | 934-J | Inspection, Assessment and Repair of Coke Drums and Peripheral Components in Delayed Coking Units | 1 | 09/02/2021 |
CRE | TR | 938-C | Use of Duplex Stainless Steels in the Oil Refining Industry | 4 | 05/16/2024 |
CRE | TR | 941-A-A1 | Addendum 1 to The Technical Basis Document for API RP 941 | 1 | 06/25/2019 |
CRE | TR | 978 | Monolithic Refractories Manufacture, Properties and Selection | 1 | 03/14/2019 |
CRE | TR | 981 | Thermal Expansion Under Load and Creep of Refractories-An Evaluation and Comparison of Testing Methods Comparison of ASTM C832 and DIN EN 993-9 | 1 | 03/26/2021 |
CSOEM | API | 0000 | Winter Oil Spill Recovery Tactical Guidance Document | 1 | 02/09/2024 |
CSOEM | API | OSRC | Proceedings of the 2018 Offshore Structural Reliability Conference | 2 | 01/31/2020 |
CSOEM | Bull | 16H | Automated Safety Instrumented Systems for Onshore Blowout Preventer Actuation | 1 | 02/15/2022 |
CSOEM | RP | 10B-2 | Recommended Practice for Testing Well Cements | 3 | 07/30/2024 |
CSOEM | RP | 10B-6-A1 | Recommended Practice on Determining the Static Gel Strength of Cement Formulations | 1 | 01/23/2020 |
CSOEM | RP | 10D-2 | Centralizer Placement and Stop-collar Testing | 2 | 08/30/2023 |
CSOEM | RP | 10G | Product Evaluation, Application, and Testing of Stage Cementing Collars | 1 | 08/12/2020 |
CSOEM | RP | 11ER | Guarding of Pumping Units | 4 | 07/28/2022 |
CSOEM | RP | 11S1 | Electrical Submersible Pump Dismantle, Inspection and Failure Analysis | 4 | 04/26/2022 |
CSOEM | RP | 11S9 | Permanent Magnet Motor Safety | 1 | 03/22/2023 |
CSOEM | RP | 13B-1 | Field Testing Water-Based Drilling Fluids | 5 | 05/23/2019 |
CSOEM | RP | 13B-2 | Field Testing Oil-based Drilling Fluids | 6 | 07/27/2023 |
CSOEM | RP | 13B-2-A1 | Recommended Practice for Field Testing Oil-based Drilling Fluids (includes Errata 1 dated August 2014 and Errata 2 dated March 2018) | 5 | 08/13/2019 |
CSOEM | RP | 13C | Drilling Fluid Processing Systems Evaluation | 6 | 12/20/2023 |
CSOEM | RP | 13I | Laboratory Testing of Drilling Fluids | 9 | 12/02/2020 |
CSOEM | RP | 13I-A1 | Laboratory Testing of Drilling Fluids | 9 | 01/04/2023 |
CSOEM | RP | 13J | Testing of Heavy Brines | 6 | 01/04/2023 |
CSOEM | RP | 13K | Chemical Analysis of Barite | 4 | 03/11/2022 |
CSOEM | RP | 13L | Training and Qualification of Drilling and Completion Fluids Specialists | 3 | 10/10/2024 |
CSOEM | RP | 13M-6 | Procedure for Measuring Leakoff of Completion Fluids Under Dynamic Conditions | 1 | 05/12/2020 |
CSOEM | RP | 15SA | Integrity Assessment of Spoolable Reinforced Line Pipe | 1 | 02/16/2022 |
CSOEM | RP | 15SIH | Installation and Handling of Spoolable Reinforced Line Pipe | 1 | 10/07/2021 |
CSOEM | RP | 15TL4 | Care and Use of Fiberglass Tubulars | 3 | 10/13/2022 |
CSOEM | RP | 15WT | Operations for Lay Flat Hose in Oilfield Water Applications | 1 | 12/17/2019 |
CSOEM | RP | 16Q-A1 | Design, Selection, Operation and Maintenance of Marine Drilling Riser Systems | 2 | 02/08/2023 |
CSOEM | RP | 16Q-A1-A2 | Design, Selection, Operation and Maintenance of Marine Drilling Riser Systems | 2 | 03/25/2024 |
CSOEM | RP | 16ST | Coiled Tubing Well Control Equipment Systems | 2 | 02/11/2021 |
CSOEM | RP | 16ST-A1 | Coiled Tubing Well Control Equipment Systems | 2 | 02/04/2022 |
CSOEM | RP | 17A | Design and Operation of Subsea Production Systems - General Requirements and Recommendations | 6 | 05/24/2022 |
CSOEM | RP | 17B | Recommended Practice for Flexible Pipe | 6 | 05/29/2024 |
CSOEM | RP | 17G1 | Configuration and Operation for Subsea Well Intervention Systems | 1 | 07/06/2022 |
CSOEM | RP | 17G2 | Recommended Practice for Subsea Pumping Well Intervention Systems | 1 | 10/24/2023 |
CSOEM | RP | 17G3 | Recommended Practice for Subsea Well Intervention Systems Using Non-Ferrous Alloys | 1 | 02/12/2021 |
CSOEM | RP | 17G5 | Subsea Intervention Workover Control Systems | 1 | 11/22/2019 |
CSOEM | RP | 17G6 | Global Analysis of Subsea Well Intervention Systems | 1 | 10/18/2023 |
CSOEM | RP | 17H | Remotely Operated Tools and Interfaces on Subsea Production Systems | 3 | 07/23/2019 |
CSOEM | RP | 17L2 | Recommended Practice for Ancillary Equipment for Flexible Pipes and Subsea Umbilicals | 2 | 06/21/2021 |
CSOEM | RP | 17P | Recommended Practice for Subsea Structures and Manifolds | 2 | 01/31/2019 |
CSOEM | RP | 17R | Recommended Practice for Flowline Connectors and Jumpers | 2 | 12/08/2022 |
CSOEM | RP | 17S | Recommended Practice for the Design, Testing and Operation of Subsea Multiphase Flow Meters | 2 | 05/05/2022 |
CSOEM | RP | 17U | Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment | 2 | 12/12/2023 |
CSOEM | RP | 17W | Recommended Practice for Subsea Capping Stacks | 2 | 03/04/2021 |
CSOEM | RP | 17X | Recommended Practice for Subsea Pump Module Systems | 1 | 10/05/2021 |
CSOEM | RP | 17Y | Recommended Practice for Design, Testing and Qualification of Subsea Chemical Injection Delivery Systems | 1 | 04/07/2022 |
CSOEM | RP | 17Z | Medium Voltage Equipment Used on Subsea Production Systems | 1 | 01/02/2024 |
CSOEM | RP | 19B | Evaluation of Well Perforators | 3 | 07/30/2021 |
CSOEM | RP | 19B-A1 | Evaluation of Well Perforators | 3 | 03/31/2023 |
CSOEM | RP | 19D | Measuring Conductivity of Proppants | 2 | 11/02/2021 |
CSOEM | RP | 19G5 | Operation, Maintenance, Surveillance and Troubleshooting of Gas-Lift Installations | 1 | 07/08/2019 |
CSOEM | RP | 19GLHB | Gas Lift Handbook | 1 | 06/04/2020 |
CSOEM | RP | 19GLHB-A1 | Gas Lift Handbook | 1 | 05/23/2023 |
CSOEM | RP | 19GLHB-A2 | Gas Lift Handbook | 1 | 11/14/2024 |
CSOEM | RP | 2A-LRFD | Planning, Designing, and Constructing Fixed Offshore Platforms - Load and Resistance Factor Design | 2 | 08/01/2019 |
CSOEM | RP | 2D-2 | Training for Offshore Pedestal-Mounted Crane Riggers, Operators, and Inspectors | 1 | 10/20/2020 |
CSOEM | RP | 2D-A1 | Operation and Maintenance of Offshore Cranes | 7 | 10/20/2020 |
CSOEM | RP | 2EQ-A1 | Seismic Design Procedures and Criteria for Offshore Structures | 1 | 01/04/2019 |
CSOEM | RP | 2FSIM | Floating Systems Integrity Management | 1 | 09/10/2019 |
CSOEM | RP | 2MET | Metocean Design and Operating Considerations | 2 | 01/04/2021 |
CSOEM | RP | 2MIM | Mooring Integrity Management | 1 | 09/10/2019 |
CSOEM | RP | 2RIM | Integrity Management of Risers from Floating Production Facilities | 1 | 09/10/2019 |
CSOEM | RP | 2SK | Design and Analysis of Stationkeeping Systems for Floating Offshore Structures | 4 | 02/12/2024 |
CSOEM | RP | 2TOP | Topsides Structure | 1 | 08/01/2019 |
CSOEM | RP | 4G | Operation, Inspection, Maintenance, and Repair of Drilling and Well Servicing Structures | 5 | 02/28/2019 |
CSOEM | RP | 4G-A1 | Operation, Inspection, Maintenance, and Repair of Drilling and Well Servicing Structures | 5 | 06/17/2020 |
CSOEM | RP | 4G-A2 | Operation, Inspection, Maintenance, and Repair of Drilling and Well Servicing Structures | 5 | 09/30/2020 |
CSOEM | RP | 5A3 | Thread Compounds for Casing, Tubing, Line Pipe, and Drill Stem Elements | 4 | 02/13/2023 |
CSOEM | RP | 5C5-A1 | Procedures for Testing Casing and Tubing Connections | 4 | 05/25/2021 |
CSOEM | RP | 5L3-A1 | Drop-Weight Tear Tests on Line Pipe | 4 | 10/27/2020 |
CSOEM | RP | 5MT | Pipeline Inspection Documents for Material Traceability and Electronic Test Reports | 1 | 09/30/2021 |
CSOEM | RP | 65-3 | Wellbore Plugging and Abandonment | 1 | 06/07/2021 |
CSOEM | RP | 67 | Oilfield Explosives Safety | 3 | 10/03/2019 |
CSOEM | RP | 6AF3 | High-Pressure High-Temperature (HPHT) Flange Design Methodology | 2 | 05/29/2024 |
CSOEM | RP | 6AR | Repair and Remanufacture of Wellhead and Tree Equipment | 2 | 09/09/2019 |
CSOEM | RP | 6HT | Heat Treatment and Testing of Carbon, Micro-alloyed, and Low-alloy Steel Wrought and Cast Components | 3 | 03/17/2023 |
CSOEM | RP | 6J | Testing of Oilfield Elastomers | 2 | 10/28/2022 |
CSOEM | RP | 7G-1 | Drill Stem Performance Properties | 17 | 04/19/2023 |
CSOEM | RP | 7G-2 | Inspection and Classification of Used Drill Stem Elements | 2 | 10/26/2020 |
CSOEM | RP | 8B-A1 | Inspection, Maintenance, Repair, and Remanufacture of Hoisting Equipment | 8 | 03/19/2019 |
CSOEM | RP | 8B-A2 | Inspection, Maintenance, Repair, and Remanufacture of Hoisting Equipment | 8 | 07/12/2021 |
CSOEM | RP | 8FV1 | Field Verification of Rig Devices for Oil and Gas Well Drilling Operations | 1 | 10/23/2024 |
CSOEM | RP | 9B-A1 | Application, Care, and Use of Wire Rope for Oil Field Service | 14 | 09/09/2020 |
CSOEM | Spec | 10A | Cements and Materials for Well Cementing | 25 | 03/21/2019 |
CSOEM | Spec | 10A-A1 | Cements and Materials for Well Cementing | 25 | 11/27/2019 |
CSOEM | Spec | 10A-A2 | Cements and Materials for Well Cementing | 25 | 08/12/2022 |
CSOEM | Spec | 10D | Casing Bow-spring Centralizers | 7 | 04/01/2021 |
CSOEM | Spec | 11AX-A1 | Subsurface Sucker Rod Pump Assemblies, Components and Fittings | 13 | 05/09/2019 |
CSOEM | Spec | 11B | Sucker Rods and Rod-Related Products | 28 | 12/12/2023 |
CSOEM | Spec | 11D1 | Packers and Bridge Plugs | 4 | 03/01/2021 |
CSOEM | Spec | 11D1-A1 | Packers and Bridge Plugs | 4 | 04/12/2022 |
CSOEM | Spec | 11E | Pumping Units | 20 | 10/18/2022 |
CSOEM | Spec | 11PL | Plunger Lift Lubricators and Related Equipment | 1 | 06/06/2019 |
CSOEM | Spec | 13A | Drilling Fluid Materials | 19 | 10/10/2019 |
CSOEM | Spec | 13A-A1 | Drilling Fluid Materials | 19 | 04/14/2020 |
CSOEM | Spec | 13A-A2 | Drilling Fluid Materials | 19 | 06/23/2022 |
CSOEM | Spec | 14A | Subsurface Safety Valve and Annular Safety Valve Equipment | 13 | 03/14/2024 |
CSOEM | Spec | 14L | Lock Mandrels and Landing Nipples | 3 | 06/03/2020 |
CSOEM | Spec | 15LE | Polyethylene (PE) Line Pipe | 5 | 09/08/2022 |
CSOEM | Spec | 15LF | Layflat Hose Assemblies for the Transport of Water in Oilfield Applications | 1 | 05/12/2021 |
CSOEM | Spec | 15PX | Specification for Crosslinked Polyethylene (PEX) Line Pipe | 2 | 02/08/2022 |
CSOEM | Spec | 15S | Spoolable Reinforced Plastic Line Pipe | 3 | 04/11/2022 |
CSOEM | Spec | 15S-A1 | Spoolable Reinforced Plastic Line Pipe | 3 | 08/04/2023 |
CSOEM | Spec | 15S-E1-A1 | Spoolable Reinforced Plastic Line Pipe | 2 | 10/18/2019 |
CSOEM | Spec | 16C | Choke and Kill Equipment | 3 | 03/10/2021 |
CSOEM | Spec | 16C-A1 | Choke and Kill Equipment | 3 | 07/25/2024 |
CSOEM | Spec | 16D-A1 | Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment | 3 | 07/31/2023 |
CSOEM | Spec | 16F-A1 | Specification for Marine Drilling Riser Equipment | 2 | 01/26/2021 |
CSOEM | Spec | 16F-A2 | Marine Drilling Riser Equipment | 2 | 12/08/2022 |
CSOEM | Spec | 16RCD | Rotating Control Devices | 3 | 06/01/2022 |
CSOEM | Spec | 16RCD-A1 | Rotating Control Devices | 3 | 10/03/2022 |
CSOEM | Spec | 16RCD-A1-A2 | Rotating Control Devices | 3 | 11/15/2023 |
CSOEM | Spec | 17D | Specification for Subsea Wellhead and Tree Equipment | 3 | 10/04/2021 |
CSOEM | Spec | 17D-A1 | Specification for Subsea Wellhead and Tree Equipment | 3 | 12/08/2022 |
CSOEM | Spec | 17D-A2 | Specification for Subsea Wellhead and Christmas Tree Equipment | 2 | 09/27/2019 |
CSOEM | Spec | 17J | Specification for Unbonded Flexible Pipe | 5 | 05/29/2024 |
CSOEM | Spec | 17L1 | Specification for Ancillary Equipment for Flexible Pipes and Subsea Umbilicals | 2 | 06/21/2021 |
CSOEM | Spec | 19CI | Downhole Chemical Injection Devices and Related Equipment | 1 | 06/14/2019 |
CSOEM | Spec | 19E | Electrical and Electronic Components for use in Downhole Completion Equipment | 1 | 09/09/2024 |
CSOEM | Spec | 19G1 | Side-pocket Mandrels | 2 | 02/22/2019 |
CSOEM | Spec | 19G1-A1 | Side-pocket Mandrels | 2 | 10/01/2021 |
CSOEM | Spec | 19G2 | Flow-control Devices for Side-pocket Mandrels | 2 | 09/11/2020 |
CSOEM | Spec | 19G2-A1 | Flow-control Devices for Side-pocket Mandrels | 1 | 01/09/2019 |
CSOEM | Spec | 19G2-A1 | Flow-control Devices for Side-pocket Mandrels | 2 | 06/30/2022 |
CSOEM | Spec | 19ICD | Inflow Control Devices | 1 | 05/04/2020 |
CSOEM | Spec | 19ICV | Interval Control Valves | 1 | 06/13/2023 |
CSOEM | Spec | 19LH | Liner Hanger Equipment | 1 | 06/18/2019 |
CSOEM | Spec | 19LH-A1 | Liner Hanger Equipment | 1 | 05/25/2021 |
CSOEM | Spec | 19PT | Downhole Perforating Tools | 1 | 05/23/2022 |
CSOEM | Spec | 19V | Subsurface Completion Isolation (Barrier) Valves and Related Equipment | 2 | 05/14/2019 |
CSOEM | Spec | 19V-A1 | Subsurface Completion Isolation (Barrier) Valves and Related Equipment | 2 | 09/09/2022 |
CSOEM | Spec | 20A | Carbon Steel, Alloy Steel, Stainless Steel, and Nickel Base Alloy Castings for Use in the Petroleum and Natural Gas Industry | 3 | 07/26/2024 |
CSOEM | Spec | 20A-A2 | Carbon Steel, Alloy Steel, Stainless Steel, and Nickel Base Alloy Castings for Use in the Petroleum and Natural Gas Industry | 2 | 04/14/2020 |
CSOEM | Spec | 20B | Open Die Shaped Forgings for use in the Petroleum and Natural Gas Industry | 2 | 11/17/2020 |
CSOEM | Spec | 20C | Closed Die Forgings for Use in the Petroleum and Natural Gas Industry | 3 | 04/30/2020 |
CSOEM | Spec | 20E | Alloy and Carbon Steel Bolting for Use in the Petroleum and Natural Gas Industries | 3 | 03/07/2024 |
CSOEM | Spec | 20E-A2 | Alloy and Carbon Steel Bolting for use in the Petroleum and Natural Gas Industries | 2 | 03/25/2019 |
CSOEM | Spec | 20F-E1-A1 | Corrosion Resistant Bolting for Use in the Petroleum and Natural Gas Industries | 2 | 11/04/2021 |
CSOEM | Spec | 2C | Offshore Pedestal-mounted Cranes | 8 | 10/20/2020 |
CSOEM | Spec | 2MT2-A1 | Rolled Shapes with Improved Notch Toughness | 1 | 12/08/2019 |
CSOEM | Spec | 2W | Steel Plates Produced by Thermo-Mechanically Controlled Processing (TMCP) for Offshore Structures | 6 | 01/04/2019 |
CSOEM | Spec | 4F | Specification for Drilling and Well Servicing Structures | 5 | 06/30/2020 |
CSOEM | Spec | 4F-A1 | Specification for Drilling and Well Servicing Structures | 5 | 08/09/2023 |
CSOEM | Spec | 4F-A2 | Specification for Drilling and Well Servicing Structures | 4 | 05/01/2019 |
CSOEM | Spec | 5B-A2 | Threading, Gauging, and Thread Inspection of Casing, Tubing, and Line Pipe Threads | 16 | 12/08/2019 |
CSOEM | Spec | 5B-A3 | Threading, Gauging, and Thread Inspection of Casing, Tubing, and Line Pipe Threads | 16 | 01/13/2021 |
CSOEM | Spec | 5CRA | Corrosion-resistant Alloy Seamless Products for Use as Casing, Tubing, Coupling Stock, and Accessory Material | 2 | 10/03/2022 |
CSOEM | Spec | 5CT | Casing and Tubing | 11 | 12/19/2023 |
CSOEM | Spec | 5CT-A1 | Casing and Tubing | 10 | 01/13/2021 |
CSOEM | Spec | 5DP | Drill Pipe | 2 | 05/22/2020 |
CSOEM | Spec | 5LD-E1-A1 | CRA Clad or Lined Steel Pipe | 4 | 02/21/2024 |
CSOEM | Spec | 5ST-A1 | Specification for Coiled Tubing | 1 | 02/21/2024 |
CSOEM | Spec | 6A-A1 | Specification for Wellhead and Tree Equipment | 21 | 07/27/2020 |
CSOEM | Spec | 6A-A2 | Specification for Wellhead and Tree Equipment | 21 | 06/14/2021 |
CSOEM | Spec | 6A-A3 | Specification for Wellhead and Tree Equipment | 21 | 08/22/2022 |
CSOEM | Spec | 6A-A4 | Specification for Wellhead and Tree Equipment | 21 | 11/13/2024 |
CSOEM | Spec | 6D | Specification for Valves | 25 | 11/10/2021 |
CSOEM | Spec | 6D-A1 | Specification for Valves | 25 | 04/03/2023 |
CSOEM | Spec | 6D-A2 | Specification for Valves | 25 | 09/05/2024 |
CSOEM | Spec | 6DSS-A1 | Specification for Subsea Pipeline Valves | 3 | 04/19/2019 |
CSOEM | Spec | 6DSS-A2 | Specification for Subsea Pipeline Valves | 3 | 06/23/2022 |
CSOEM | Spec | 7-1 | Rotary Drill Stem Elements | 2 | 02/23/2023 |
CSOEM | Spec | 7-1-A4 | Specification for Rotary Drill Stem Elements (Includes Addendum 1, March 2007, Addendum 2, August 2009, Addendum 3, April 2011, and Addendum 4, February 2019) | 1 | 02/14/2019 |
CSOEM | Spec | 7-1-E1 | Specification for Rotary Drill Stem Elements (Includes Addendum 1, March 2007, Addendum 2, August 2009, Addendum 3, April 2011, Addendum 4, February 2019, and Errata 1, July 2020) | 1 | 07/17/2020 |
CSOEM | Spec | 7-2-A1 | Threading and Gauging of Rotary Shouldered Connections (includes Errata 1, August 2017 and Errata 2, November 2019 and Addenda 1, March 2020) | 2 | 03/12/2020 |
CSOEM | Spec | 7-2-A1-E1-E2-A2 | Threading and Gauging of Rotary Shouldered Connections | 2 | 09/07/2023 |
CSOEM | Spec | 7HU2 | Oilfield Hammer Unions | 1 | 03/03/2022 |
CSOEM | Spec | 7NRV-A1 | Specification on Non-Return Valves | 1 | 12/08/2019 |
CSOEM | Spec | 7V | Drill Stem Valves | 1 | 04/29/2024 |
CSOEM | Spec | 9A | Specification for Wire Rope | 27 | 08/11/2020 |
CSOEM | Spec | 9A-A1 | Specification for Wire Rope | 27 | 05/11/2023 |
CSOEM | Spec | Q1 | Quality Management System Requirements for Organizations Providing Products for the Petroleum and Natural Gas Industry | 10 | 09/18/2023 |
CSOEM | Spec | Q1-A1 | Quality Management System Requirements for Organizations Providing Products for the Petroleum and Natural Gas Industry | 10 | 10/10/2024 |
CSOEM | Spec | Q2 | Quality Management System Requirements for Service Supply Organizations for the Petroleum and Natural Gas Industries | 2 | 07/14/2021 |
CSOEM | Std | 17F | Standard for Subsea Production and Processing Control Systems | 5 | 04/17/2023 |
CSOEM | Std | 17G | Design and Manufacture of Subsea Well Intervention Equipment | 3 | 11/22/2019 |
CSOEM | Std | 1PTC | Product Design and Manufacturing Conformance | 1 | 11/19/2024 |
CSOEM | Std | 20D | Qualification of Nondestructive Examination Services for Equipment used in the Petroleum and Natural Gas Industry | 2 | 08/13/2019 |
CSOEM | Std | 20G | Welding Services for Equipment used in the Petroleum and Natural Gas Industry | 1 | 01/21/2020 |
CSOEM | Std | 20H | Heat Treatment Services - Batch Type for Equipment Used in the Petroleum and Natural Gas Industry | 2 | 04/21/2020 |
CSOEM | Std | 20J | Qualification of Distributors of Metallic Materials for Use in the Petroleum and Natural Gas Industries | 2 | 04/20/2022 |
CSOEM | Std | 20J-A1 | Qualification of Distributors of Metallic Materials for Use in the Petroleum and Natural Gas Industries | 1 | 01/21/2020 |
CSOEM | Std | 20N | Heat Treatment Services - Continuous Furnace for Equipment Used in the Petroleum and Natural Gas Industry | 1 | 08/15/2019 |
CSOEM | Std | 20P | Qualification of Applicators of Coating/Plating Services for Equipment Used in the Petroleum and Natural Gas Industries | 1 | 05/17/2024 |
CSOEM | Std | 20S | Additively Manufactured Metallic Components for Use in the Petroleum and Natural Gas Industries | 1 | 10/19/2021 |
CSOEM | Std | 20T | Additively Manufactured Polymer-Based Components for Use in the Petroleum and Natural Gas Industries | 1 | 08/23/2022 |
CSOEM | Std | 6ACRA-A3 | Age-Hardened Nickel-Based Alloys for Oil and Gas Drilling and Production Equipment | 1 | 02/04/2019 |
CSOEM | Std | 6AV2 | Installation, Maintenance and Repair of Surface Safety Valves and Underwater Safety Valves Offshore | 2 | 08/07/2020 |
CSOEM | Std | 6DSSX | Operator and Mounting Kits for Subsea Valves | 1 | 03/23/2021 |
CSOEM | Std | 6DX | Standard for Actuators and Mounting Kits for Valves | 2 | 02/11/2020 |
CSOEM | Std | 6DX-A1 | Standard for Actuators and Mounting Kits for Valves | 2 | 03/07/2023 |
CSOEM | Std | 6FA | Standard for Fire Test of Valves | 5 | 05/29/2020 |
CSOEM | Std | 6FB | Standard for Fire Test for End Connections | 4 | 05/20/2019 |
CSOEM | Std | 6X | Design Calculations for Pressure-containing Equipment | 2 | 02/04/2019 |
CSOEM | TR | 13TR1-A1 | Stress Corrosion Cracking of Corrosion Resistant Alloys in Halide Brines Exposed to Acidic Production Gas | 1 | 07/07/2022 |
CSOEM | TR | 16G | Well Control Equipment Reliability Modeling | 1 | 03/24/2023 |
CSOEM | TR | 17TR16 | Subsea Hydrocarbon Production Leak Detection Systems Using Process Data | 1 | 12/15/2022 |
CSOEM | TR | 17TR8 | High-Pressure High-Temperature Design Guidelines | 3 | 07/06/2022 |
CSOEM | TR | 17TR8-A1 | High-Pressure High-Temperature Design Guidelines | 2 | 04/25/2019 |
CSOEM | TR | 21B | Round Robin Test Program for Development of Hardness Conversions for Precipitation Hardened Nickel Alloys and Martensitic Stainless Steels | 1 | 06/28/2024 |
CSOEM | TR | 21D | A Study of the Effect of Thread Forming on the Susceptibility of Precipitation Hardened Ni-Based Alloy Fasteners to Hydrogen Embrittlement | 1 | 08/22/2024 |
CSOEM | TR | 21TR1 | Materials Selection for Bolting | 1 | 08/12/2019 |
CSOEM | TR | 21TR1-A1 | Materials Selection for Bolting | 1 | 04/15/2020 |
CSOEM | TR | 21TR1-A2 | Materials Selection for Bolting | 1 | 06/26/2020 |
CSOEM | TR | 21TR1-A2-A3 | Materials Selection for Bolting | 1 | 05/13/2022 |
CSOEM | TR | 21TR2 | S-N Fatigue Design Guidelines and Test Data for Bolts | 1 | 03/08/2022 |
CSOEM | TR | 2A-LFS | Load Factor Study for API Recommended Practice 2A-LRFD | 1 | 11/20/2020 |
CSOEM | TR | 2FC-1 | Studlink and Studless Fatigue Curves for Mooring Lines | 1 | 01/06/2020 |
CSOEM | TR | 2FC-2 | Fatigue TN Curves for Chain, Wire, and Polyester Mooring Lines (Including Corrections for High-Tension Ranges) | 1 | 01/06/2020 |
CSOEM | TR | 2PY | Effect of Best-Estimate Geotechnical p-y Curves on Performance of Offshore Structures | 1 | 02/25/2020 |
CSOEM | TR | 5C3-A1 | Calculating Performance Properties of Pipe Used as Casing or Tubing (includes Addenda 1, October 2019) | 7 | 10/29/2019 |
CSOEM | TR | 5HIC | Defining Hydrogen-induced Cracking Test Criteria for Commodity-grade Line Pipe in Less Severe Sour Conditions | 1 | 08/08/2024 |
CSOEM | TR | 6AF3 | High-Pressure High-Temperature (HPHT) Flange Design Methodology | 1 | 08/12/2020 |
CSOEM | TR | 6MET | Metallic Material Limits for API Equipment Used in High Temperature Applications | 3 | 07/11/2022 |
CSOEM | TR | 6RT | Guidelines for Design and Manufacture of Surface Wellhead Running, Retrieving and Testing Tools, Clean-out Tools and Wear Bushings | 1 | 02/11/2020 |
CSOEM | TR | 7CR | Cold Working Thread Roots with CNC Lathes for Rotary Shouldered Connections | 1 | 01/10/2020 |
DPOSC | Bull | 4565 | Species and Habitat Conservation: Industry Fundamentals | 1 | 11/02/2022 |
DPOSC | Bull | 4719(b) | Industry Recommended Response Worker Safety Considerations for Requesting Regulatory Concurrence for Subsea Dispersant Use | 1 | 11/09/2022 |
DPOSC | Bull | 4785 | Cold Weather Hazards and Winterizing Operating Considerations for U.S. Onshore Upstream Facilities | 1 | 08/15/2024 |
DPOSC | RP | 100-3 | Community Engagement Guidelines | 2 | 04/04/2024 |
DPOSC | RP | 12J | Process Design of Oil and Gas Separators and Scrubbers | 9 | 09/06/2024 |
DPOSC | RP | 54 | Occupational Safety and Health for Oil and Gas Well Drilling and Servicing Operations | 4 | 02/20/2019 |
DPOSC | RP | 54-A1 | Occupational Safety for Oil and Gas Well Drilling and Servicing Operations | 4 | 06/28/2021 |
DPOSC | RP | 75 | Safety and Environmental Management System for Offshore Operations and Assets | 4 | 12/04/2019 |
DPOSC | RP | 75W | Safety and Environmental Management System for Offshore Wind Operations and Assets | 1 | 07/02/2024 |
DPOSC | RP | 79-1 | Tripping Operations in Hydrostatically Overbalanced Wells | 1 | 12/12/2022 |
DPOSC | RP | 90-1 | Annular Casing Pressure Management for Offshore Wells (Formerly RP 90) | 2 | 08/12/2021 |
DPOSC | RP | 92C | Managed Pressure Drilling Operations – Controlled Mud Level with a Subsea Blowout Preventer | 1 | 09/03/2024 |
DPOSC | RP | 92M-A1 | Managed Pressure Drilling Operations with Surface Back-pressure | 1 | 04/04/2023 |
DPOSC | RP | 92P | Managed Pressure Drilling Operations — Pressurized Mud Cap Operations with Subsea Blowout Preventer | 1 | 06/05/2019 |
DPOSC | RP | 92S-A1 | Managed Pressure Drilling Operations – Surface Back-pressure with a Subsea Blowout Preventer | 1 | 04/04/2023 |
DPOSC | RP | 97L | Onshore Well Construction Interface Document | 1 | 12/02/2020 |
DPOSC | RP | T-8 | Safety Training for Workers on Offshore Production Facilities | 1 | 01/21/2019 |
GCM | API | 1509 | Engine Oil Licensing and Certification System | 18 | 07/10/2019 |
GCM | API | 1525A | Bulk Engine Oil Chain of Custody and Quality Documentation | 2 | 11/17/2021 |
GCM | RP | 1525 | Bulk Oil Testing, Handling, and Storage Guidelines | 2 | 06/01/2021 |
GCM | RP | 1604 | Closure of Underground Petroleum Storage Tanks | 4 | 02/03/2021 |
GCM | RP | 1637 | Using the API Color-symbol System to Mark Equipment and Vehicles for Product Identification at Service Stations and Distribution Terminals | 4 | 04/21/2020 |
GCM | RP | 1640 | Recommended Practice for Product Quality in Light Product Storage and Handling Operations | 2 | 02/24/2021 |
GCM | RP | 1646 | Safe Work Practices for Contractors Working at Retail Petroleum/Convenience Facilities - Spanish | 2 | 10/13/2020 |
GCM | TR | 1533 | Lubricants Life Cycle Assessment and Carbon Footprinting – Methodology and Best Practice | 1 | 05/04/2023 |
GCOP | RP | 1161 | Pipeline Operator Qualification | 4 | 02/08/2019 |
GCOP | TR | 0001 | Evaluation and Comparison of Habitat and Resource Equivalency Analysis as Used to Conduct OPA NRDA | 1 | 06/08/2022 |
RPSG | RP | 751 | Safe Operation of Hydrofluoric Acid Alkylation Units | 5 | 08/24/2021 |
RPSG | RP | 752 | Management of Hazards Associated with Location of Process Plant Permanent Buildings | 4 | 01/16/2024 |
RPSG | RP | 753 | Management of Hazards Associated with Location of Process Plant Portable Buildings | 2 | 01/16/2024 |
RPSG | RP | 754 | Process Safety Performance Indicators for the Refining and Petrochemical Industries | 3 | 08/10/2021 |
RPSG | RP | 755 | Fatigue Prevention Guidelines for the Refining and Petrochemical Industries | 2 | 05/02/2019 |
RPSG | RP | 756 | Management of Hazards Associated with Location of Process Plant Tents | 2 | 01/16/2024 |